The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift. Identify the correct sequence of steps to achieve this requirement.
A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?
A. The Production Operator can report and exception and the application generates a notification that is
sent to all users who have access to the manufacturing plant.
B. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
D. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional
Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
A. Oracle Business Intelligence Standard Edition
B. Oracle Business Intelligence Publisher
C. Oracle Business Intelligence Enterprise Edition
D. Oracle Business Intelligence Application
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon. What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
A. 8:00 PM
B. 12:30 PM
C. 2:00 PM
D. 4:00 PM
E. 1:00 PM
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required. A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario. Identify the reason.
A. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
B. Costs for purchase components P1 and P2 are not defined in cost accounting.
C. Create Accounting was not initiated.
D. Create Accounting Distributions was not initiated.
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.
A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
B. Set the global sourcing rule in GOP to determine supply creation option as Make.
C. Set a local sourcing rule in GOP to determine supply creation option as Make.
D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation. Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?
A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
D. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
A manufacturing cloud user wants to print information available in the work order in PDF. Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
A. Work Order Traveler
B. Resource List
C. Print Labels
D. Print Component List
E. Bill of material
To reduce the subassembly stock with no impact on material planning of child components of the
subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.
A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high inventory stock.
B. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.
C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Oracle exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 1Z0-1075-20 exam preparations and Oracle certification application, do not hesitate to visit our Vcedump.com to find your solutions here.