An enterprise has these three WAN connections:
1.
public Internet
2.
business Internet
3.
MPLS
An engineer must configure two available links to route traffic via both links. Which configuration achieves this objective?
A. omp no shutdown ecmp-limit 2
B. omp no shutdown send-path-limit 2
C. omp no shutdown overlay-as 2
D. omp no shutdown route-limit 2
An engineer must apply the configuration for certificate installation to vBond Orchestrator and vSmart Controller. Which configuration accomplishes this task?
A. Option A
B. Option B
C. Option C
D. Option D
Which SD-WAN component detects path performance information in the organization to report the issue to the service provider at site ID:123456?
A. vBond Orchestrator
B. Cisco DNA
C. vManage NMS
D. vAnalytics
An engineer is configuring the branch office with a 172.16.0.0/16 subnet to use DIA for Internet traffic. All other traffic must flow to the central site or branches using the MPLS circuit. Which configuration meets the requirement?
A. Option A
B. Option B
C. Option C
D. Option D
Which policy allows communication between TLOCs of data centers and spokes and blocks communication between spokes?
A. centralized data policy
B. localized control policy
C. centralized control policy
D. localized data policy
An administrator wants to create a policy to add a traffic policer called "politer-ccnp" to police data traffic on the WAN Edge.
Which configuration accomplishes this task in vSmart?
A. Option A
B. Option B
C. Option C
D. Option D
Refer to the exhibit.
Customer XYZ cannot provision dual connectivity on both of its routers due to budget constraints but wants to use both R1 and R2 interlaces for users behind them for load balancing toward the hub site. Which configuration achieves this objective?
A. Option A
B. Option B
C. Option C
D. Option D
Refer to the exhibit.
An enterprise has hub and spoke topology where it has several VPNs. An engineer must allow users in VPN91 to reach users in VPN92 and VPN10 to reach VPN91 and VPN92. Which configuration meets these requirements?
A. Option A
B. Option B
C. Option C
D. Option D
An engineer must deploy a QoS policy with these requirements:
1.
policy name: App-police
2.
police rate: 1000000
3.
burst: 1000000
4.
exceed: drop
Which configuration meets the requirements?
A. Option A
B. Option B
C. Option C
D. Option D
Refer to the exhibit.
An organization is testing a Cisco SD-WAN solution and decided to have the control plane established first and not the data plane at the time of migration. Which configuration achieves this goal?
A. Option A
B. Option B
C. Option C
D. Option D
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 300-415 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.