The DevOps team of an organization wants to deploy with persistent storage on a dedicated vSAN cluster. The storage administrator is tasked to configure the vSAN cluster and leverage the vSAN Direct feature.
Which two requirements must the administrator meet to complete this task? (Choose two.)
A. A valid vSAN license for the vSAN cluster
B. HA enabled on the vSAN cluster
C. A dedicated network for vSAN Direct
D. An integration with vSAN File Services
E. Unclaimed disks in the hosts forvSAN Direct
An existing vSAN OSA cluster has this specification:
Four ESXi hosts with all flash configuration Each with two disk groups Each disk group with one cache device and four capacity devices There are five more device slots available per host
The CTO would like to provision new applications, and these will need more capacity and performance.
Which two methods should be used by the vSAN administrator to meet this goal with the least amount of impact? (Choose two.)
A. Replacing all capacity devices with a similar larger device
B. Replacing all cache devices with a larger device
C. Adding one more disk group per host with the same configuration
D. Adding faster cache devices
E. Adding an ESXi host with identical device configuration
A vSAN administrator is using the vSAN ReadyNode Sizer to build a new environment. While entering the cluster configurations, a fellow colleague inquires about the Operations Reserve option.
What is the purpose of using this option?
A. Provides space for internal operations
B. Configures space for external operations
C. Reserves space for tolerating failures
D. Allocates space forvSAN uparades
What is the purpose of host rebuild reserve in vSAN?
A. Reserves space for internal operations
B. Reserves space in case of single host failure
C. Stores vSphere HA heartbeats
D. Allocates capacity for vCLS
After a server power failure, the administrator noticed the scheduled resyncing in the cluster monitor displays objects to be resynchronized under the pending category.
Why are there objects in this category?
A. The delay timer has not expired.
B. These objects belong to virtual machines, which are powered off.
C. Object resynchronization must be started manually.
D. There are too many objects to be synchronized.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only VMware exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 5V0-22.23 exam preparations and VMware certification application, do not hesitate to visit our Vcedump.com to find your solutions here.