The Risk-Based Testing technique can be applied at any stage after:
A. Unit Testing is Completed
B. Design Phase is Signed Off
C. System Testing is Completed
D. Coding is Completed
Which of the following is a White Box Technique?
A. Path Testing
B. Boundary Value Analysis C. Equivalence Partitioning
D. State Transition Testing
Given the following sets of Testing Activities terms (a-e), and activity descriptions (1-5), which one of the following best pairs the two sets? a ?Equivalence Testing b ?Boundary Value Analysis c ?Smoke Testing d ?Regression Testing e ?Stress Testing 1 璄nsure that changes do not have a negative impact 2 璄nsure whether the most crucial functions of a program work 3 璘se transaction simulator software 4 璕educe the number of test cases by assigning responses to classes 5 瑼pproach also referred as limit testing
A. a1, b2, c4, d3, e5
B. a5, b4, c2, d3, e1
C. a4, b5, c2, d1, e3
D. a2, b4, c5, d3, e1
Which of the following is NOT an example of Integration Strategy?
A. Big Bang
B. Design Based
C. Top-Down
D. Bottom-Up
System Testing should be conducted in an environment which is a replica of the:
A. Development Environment
B. Production Environment
C. Testing Environment
D. UAT Environment
The purpose of _____________ is to find those defects that occur in the transitions between one unit and another.
A. System Testing
B. User Acceptance Testing
C. Black Box Testing
D. Integration Testing
Which of the following is true of the V-Model?
A. It states that modules are tested against user requirements
B. It only models the testing phase
C. It specifies the test techniques to be used
D. It represents the relationship of the verification and validation activities
Which of the following statements about reviews is true?
A. Reviews cannot be performed on user requirements specifications
B. Reviews are the least effective way of testing code
C. Reviews are unlikely to find faults in test plans
D. Reviews should be performed on specifications, code, and test plans
Which of the following describes the major benefit of testing throughout the software development life cycle?
A. It allows the identification of changes in user requirements
B. It facilitates timely set up of the test environment
C. It reduces defect multiplication
D. It reduces the cost of finding and fixing defects by identifying them as close to their creation as possible
The following are different causes of defects, EXCEPT:
A. Ambiguous Requirements
B. Poor Design
C. Incorrect Translation of the Design into Code
D. Signed Off Requirements
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Software exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CABA exam preparations and Software certification application, do not hesitate to visit our Vcedump.com to find your solutions here.