  • Question 161:

    What is the Probability value of the area under the curve between -1.0 and -2.0 Standard deviation units in Normal Distribution?

    A. 0.3413

    B. 0.4772

    C. 0.1359

    D. 0.8185

  • Question 162:

    Three Standard Deviations on left and right side of the mean would include what % of the total data points in Normal Distribution?

    A. 68 %

    B. 97 %

    C. 99 %

    D. 95 %

  • Question 163:

    A software development process has UAT Defect density as Y, percent review effectiveness as X1 and percent design phase effort as X2. Indicate the type of regression model Y= -0.1320 X1 + 0.16 X2 +

    23.200.

    A. Single Linear Regression

    B. Dummy Variable Regression

    C. Multi Linear Regression

    D. Logistic Regression

  • Question 164:

    _____ determines the nature of relationship which would help us to make predictions.

    A. Correlation Analysis

    B. Regression Analysis

    C. Stability Analysis

    D. Capability Analysis

  • Question 165:

    In a project, defect density increases and Productivity decreases in subsequent releases. Indicate what kind of relationship that you can interpret in this pair (x, y)?

    A. Weak Positive Correlation

    B. Strong Negative Correlation

    C. No relation

    D. Strong Positive Correlation

  • Question 166:

    The design and code review effort is high (process is effective) in a project, and it results in less number of defects injected in UAT phase. Identify the appropriate type of correlation between review effort and number of defects. (Assume that "r" value is good).

    A. Positive Correlation

    B. Strong Negative Correlation

    C. Non linear Correlation

    D. Strong Positive Correlation

  • Question 167:

    The Organization Specification limits are + 5 or ?5 % where as Control Limits are + 6 %and; -2% , justify whether the Process is.

    A. Stable

    B. Capable

    C. Within control

    D. None of the above

  • Question 168:

    A process has its CPk value less than 1. The process is _____.

    A. Stable

    B. Capable

    C. Not Capable

    D. None of the above

  • Question 169:

    The area under the curve value is 1, then the mean, median and mode values would be same (True/ False).

    A. True

    B. False

  • Question 170:

    The data set is having 100 values of effort variance in % for different project releases, indicate what type of distributions would be suited for understanding the process behavior.

    A. Poison

    B. Binomial

    C. Normal

    D. Exponential

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSYB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.