The deviation of the measured value from the actual value experienced over time is known as the ___________________.
A. Bias
B. Linearity
C. Repeatability
D. Stability
Which of the following are needed to calculate the process capability index, Cp?
A. The specification limits and the Mean
B. The specification limits and ^ (Sigma Cap)
C. The process Mean and ^ (Sigma Cap)
D. The upper and lower specification limits
A Belt gathered the following defect data for a coat production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting 37 Forming 51 Stitching 82 Sealing 27
A. Forming, Sealing, Stitching, Cutting,
B. Cutting, Stitching, Sealing, Forming
C. Stitching, Forming, Cutting, Sealing
D. Forming, Cutting, Sealing, Stitching
If a set of data is very similar in value yet far off the mark relative to the targeted value this data could be said to be:
A. Precise but not accurate
B. Accurate but not precise
C. Precise but skewed
D. Accurate but distributed
A single data point falling outside a Control Limit is most likely representative of ______________.
A. Common-cause Variation
B. Special-cause Variation
C. Predictability
D. Non-normal data
With Measurement System Analysis we are concerned with Precision and _________________ of the data to be collected.
A. Sensitivity
B. Reliability
C. Variability
D. Accuracy
For any set of data, the Mean is defined as the _________________ .
A. Total number of data points
B. Largest number in the data set
C. Numerical average of all data
D. Measurement based off a quarter of the sample size
In an Attribute MSA which is a study that includes a set of trials to assess the ability of the operator to use an operational definition?
A. Discrete Measurement Study
B. Crossed Design
C. Signal Averaging
D. Operator Measurement Study
Which graphical tool is used to display the relative frequency of the number of times a measured item falls within a certain cell size?
A. Time Series Plot
B. Scatter Plot
C. Box Plot
D. Histogram
SIPOC stands for Suppliers, ___________, Process, Output and Customers.
A. Inventory
B. Investment
C. Inputs
D. Indicators
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSYB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.