The following Business Case is constructed properly.
"During 2009 the commercial loan division experienced a 2.7% default rate versus a target of less than
.5%. This costs the bank in excess of $250,000 quarterly."
A. True
B. False
Al bought a digital camera from his local electronics store. When he first used it he found the zoom lens function was inoperative because a gear was installed improperly. For the manufacturer of the camera this would be categorized as what type of cost?
A. Internal Failure Cost
B. Prevention Cost
C. External Failure Cost
D. Appraisal Cost
The formula Y = f(Xn) is a method of expressing the concept that the output of a process is a function of all the __________________?
A. Materials and labor
B. Inputs to the process
C. Line personnel and direct supervision
D. Employees of the company
Which of the following would likely be a CTQ (Critical-to-Quality) for the purchase of a service?
A. Documentation is clear
B. Was timely in delivery
C. Required no redo
D. All of these answers are correct
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process, are the _____________ variables.
A. Independent, dependent
B. Individual, multiple
C. Sole, multiple
D. Dependent, independent
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
A. Manage
B. Measure
C. Memorize
D. Manipulate
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the ______________ of the business.
A. Owners
B. Managers
C. Debt holders
D. Staff
The ROI for a project is a measurement metric that stands for _____________________ and is one of the methods used to measure the success of a Lean Six Sigma project.
A. Return on Investment
B. Recognition of Innovation
C. Recovery of Investment
D. Return on Inventory
When a process has proven itself to function at a Six Sigma level this means there are less than 3.4 defects per ___________ opportunities.
A. Hundred
B. Thousand
C. Million
D. Billion
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations from the Mean.
A. True
B. False
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSYB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.