  • Question 61:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes. Additionally, by using their tablet PCs as thin clients,

    science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high- powered HP blade servers. All 68 classrooms are multi-media equipped, enabling

    instructors to record lectures for the college s closed circuit TV system.

    The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers.

    The university needs to develop computing solutions to address the following problems and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    -Utilize IT resources and staff as efficiently as possible.

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    You propose a solution consisting of two HP 3PAR StoreServ 7400s for first-tier storage and two HP StoreVirtual 4530 systems as second-tier storage.

    What is required to replicate the first-tier data redundantly over an existing 10GbE network and provide improved ROI by migrating the existing data onto the HP StoreVirtual 4530?

    A. Three HP MPX200s two 5TB migration licenses

    B. Four HP MPX200s two 5TB migration licenses

    C. One HP MPX200 one 5TB migration license

    D. Two HP MPX200s two 5TB migration licenses

  • Question 62:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes.

    Additionally, by using their tablet PCs as thin clients, science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68

    classrooms are multi-media equipped, enabling instructors to record lectures for the college s closed circuit TV system. The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for

    document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers.

    The university needs to develop computing solutions to address the following problems and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    -Utilize IT resources and staff as efficiently as possible.

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    Which HP 3PAR Storage technology will allow the customer to automatically migrate data between different disk types to meet one of the stated business goals?

    A. Autonomic Rebalance

    B. Dynamic Optimization

    C. Peer Motion

    D. Adaptive Optimization

  • Question 63:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes.

    Additionally, by using their tablet PCs as thin clients, science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68

    classrooms are multi-media equipped, enabling instructors to record lectures for the college s closed circuit TV system.

    The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers.

    The university needs to develop computing solutions to address the following problems and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    -Utilize IT resources and staff as efficiently as possible.

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    What is required to license the top tier storage system in order to achieve the desired RTO?

    A. HP 3PAR Adaptive Optimization

    B. HP 3PAR Remote Copy

    C. HP 3PAR Online Import

    D. HP 3PAR Cluster Extension

  • Question 64:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes. Additionally, by using their tablet PCs as thin clients,

    science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68 classrooms are multi-media equipped, enabling

    instructors to record lectures for the college s closed circuit TV system. The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for document imaging and workflow for staff and

    faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers. The university needs to develop computing solutions to address the following problems

    and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    -Utilize IT resources and staff as efficiently as possible.

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    You are proposing two HP StoreVirtual 4530 arrays for the secondary storage. Which feature of HP LeftHand OS meets the IT improvement goals? (Select two.)

    A. Network RAID

    B. Peer Motion

    C. Port Persistence

    D. Volume Resynchronization

    E. Thin Provisioning

  • Question 65:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes. Additionally, by using their tablet PCs as thin clients,

    science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68 classrooms are multi-media equipped, enabling

    instructors to record lectures for the college s closed circuit TV system.

    The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers. The university needs to develop computing solutions to address the following problems

    and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    -

    Utilize IT resources and staff as efficiently as possible. The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    In order to meet the technical requirements and solve some of the current problems that the customer is facing you propose a 4-node HP 3PAR StoreServ Storage array with an additional SSD tier. Which HP best practices should you follow?

    (Select two.)

    A.

    Availability = Cage-level

    B.

    Availability = Magazine-level

    C.

    SSD CPG set size of 3+1

    D.

    SSD CPG set size of 2+1

    E.

    Growth increment = 4GB

  • Question 66:

    Refer to the scenario.

    A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

    these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes.

    Additionally, by using their tablet PCs as thin clients, science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68

    classrooms are multi-media equipped, enabling instructors to record lectures for the college s closed circuit TV system. The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for

    document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

    Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

    The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers. The university needs to develop computing solutions to address the following problems

    and current initiatives:

    -The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

    - Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

    -Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

    - Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

    -Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

    - Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

    -Provide a robust replication capability between data centers.

    -Reduce server downtime with faster backups.

    -Retain more backup data in smaller disk space.

    - Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

    -Reduce student registration time.

    -Increase number of servers while minimizing the need for additional staff to support them.

    - Utilize IT resources and staff as efficiently as possible. The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    Which business and IT objective can be addressed by proposing a server automation initiative?

    A. Increased efficiency, reliability, and ease of system administration

    B. Reduced server downtime and faster backup

    C. Robust replication capability between data centers

    D. Reduced the need for Proof of Concepts

  • Question 67:

    Refer to the scenario. Items to answer: RPO

    RTO

    Possible answers:

    A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on

    MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.

    The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported

    from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.

    The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes

    from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend,

    the re-run could take up to 10 hours, even if just one job failed.

    The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as

    several HP ProLiant DL380 servers. The company's top four IT improvements goals are as follows:

    -replacing the aging robotic tape library

    -enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)

    -retaining more backup data in smaller disk space

    -increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:

    -increased confidence in disaster recovery

    -minimal disruption by backups during regular business hours

    -improved management of external audits

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    During a follow-up meeting with your customer, you learn that there is an additional business requirement to limit the total downtime of data center systems to 72 hours, and no more than 24 hours of data can be lost. The IT department indicates that they have an existing 2-hour response time SLA with their business users for critical systems.

    What should you use for their RTO and RPO when designing a new backup solution?

    A. RPO - 24

    B. RTO - 72

  • Question 68:

    Refer to the scenario.

    A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on

    MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.

    The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported

    from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.

    The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes

    from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend,

    the re-run could take up to 10 hours, even if just one job failed.

    The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as

    several HP ProLiant DL380 servers. The company's top four IT improvements goals are as follows:

    -replacing the aging robotic tape library

    -enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)

    -retaining more backup data in smaller disk space

    - increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:

    -increased confidence in disaster recovery

    -minimal disruption by backups during regular business hours

    -improved management of external audits

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    Which additional information do you require to validate the customer DR strategy? (Select two.)

    A. WAN latency

    B. Data structure

    C. Data change rate

    D. Number of hosts

    E. Distance between data centers

  • Question 69:

    Refer to the scenario.

    A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on

    MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.

    The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported

    from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.

    The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes

    from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend,

    the re-run could take up to 10 hours, even if just one job failed.

    The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as

    several HP ProLiant DL380 servers. The company's top four IT improvements goals are as follows:

    -replacing the aging robotic tape library

    -enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)

    -retaining more backup data in smaller disk space

    - increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:

    -increased confidence in disaster recovery

    -minimal disruption by backups during regular business hours

    -improved management of external audits

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    You have proposed an HP StoreOnce 4430 Backup System with HP Data Protector at both the primary and DR site. Which benefit of the proposed solution will allow you to meet to the stated IT objectives?

    A. built-on scale-out converged storage architecture eliminating any single points of failure

    B. eliminates the need for tape backup and offsite tape storage

    C. scalable up to 768 TB of storage and provides up to 100 TB/hr of throughput

    D. backup and recovery for multiple hypervisors and physical servers from a single console

  • Question 70:

    Refer to the scenario.

    A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on

    MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.

    The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported

    from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.

    The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes

    from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend,

    the re-run could take up to 10 hours, even if just one job failed.

    The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as

    several HP ProLiant DL380 servers. The company's top four IT improvements goals are as follows:

    -replacing the aging robotic tape library

    -enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)

    -retaining more backup data in smaller disk space

    - increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:

    -increased confidence in disaster recovery

    -minimal disruption by backups during regular business hours

    -improved management of external audits

    The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

    How does an HP StoreOnce Backup solution meet the customer IT and business needs?

    A. Eliminates the need for tape backups for long-term archiving

    B. Multiplies the data, which is then replicated to a remote location

    C. Backs up the data via a WAN link

    D. Provides a bandwidth-effective replication to remote sites

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HP0-J67 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.