Exam Details

  • Exam Code
    :C1000-038
  • Exam Name
    :IBM z14 Technical Sales
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :44 Q&As
  • Last Updated
    :

IBM IBM Certifications C1000-038 Questions & Answers

  • Question 11:

    A customer runs production on one z14, with a zEC12 as a backup. The customer is planning a 50% capacity increase on both machines.

    Which of the following will satisfy the requirement?

    A. A z14 upgrade and CBU for the zEC12.

    B. Upgrade the z14 and migrate the zEC12 to a new z14 with a CBU feature.

    C. A z14 upgrade and an equivalent zEC12 capacity upgrade for the backup situation.

    D. A z14 upgrade and On/Off CoD for the zEC12.

  • Question 12:

    Which statement regarding IT Economics Studies is correct?

    A. Depending on the scope of the study, there may be charges for the customer.

    B. The IT Economics Practice is present in North America only.

    C. An IT Economics study focuses on business value, technical requirements, and cost.

    D. The customer will receive a final report, an executive summary, and a business case for a small charge.

  • Question 13:

    How was zBNA improved to support the latest driver level for the z14 server (GA2 in October 2018)?

    A. z/OS Coupling Facility Structure Encryption support

    B. PCle Express Gen3 Coupling Express Long Reach support

    C. zHyperLink write support

    D. FICON Channel Aggregation

  • Question 14:

    A security administrator would like to know more details about Coupling Facility Encryption. Their main concern is with Coupling Facility CPU overhead once encryption has been implemented.

    Which ICF overhead consideration is associated with Coupling Facility Encryption?

    A. Overhead is dependent on the number and type of structures to be encrypted.

    B. Encryption is z/OS based and will not impact Coupling Facility overhead.

    C. A Pervasive Encryption assessment can determine the overhead.

    D. Once ICA links are implemented, overhead will not be impacted.

  • Question 15:

    A z13s customer is excited about the prospect of acquiring a z14 ZR1. They are very interested in the 16U Reserved component space within the z14 ZR1 CPC.

    Which of the following is a limiting factor when proposing the 16U Reserved feature?

    A. A maximum of two I/O drawers can be ordered.

    B. The space is reserved for the IBM DS8882F.

    C. Top Exit I/O cannot be ordered.

    D. No three phase power is available.

  • Question 16:

    A client wants to add the Live Guest Relocation (LGR) feature to their IBM Z environment. Which of the following actions supports this requirement?

    A. Enabling Single System Image (SSI) on z/OS v2.3 or newer

    B. Applying the latest APAR to z/VM v5.4

    C. Enabling Security Server on z/OS

    D. Enabling Single System Image (SSI) on z/VM v6.4 or newer

  • Question 17:

    What IBM Z technology can be used to securely deploy application services using IBM Cloud Private, without having to change the application code to exploit the secure environment?

    A. CPACF with Crypto Express

    B. TKE Workstation

    C. Crypto Express

    D. Secure Service Container

  • Question 18:

    A customer is interested in IBM LinuxONE as a platform for their new cloud-based application infrastructure. A sizing exercise has shown that one LinuxONE Emperor II machine (in LM2 configuration) is sufficient for their expected workload, but the customer is concerned about putting all the application workload on a single frame.

    Which set of LinuxONE features can the technical specialist remind the customer about, to help to relieve their concern?

    A. RAIM memory, Capacity on Demand, SIMD

    B. Processor sparing, I/O redundancy, RAIM memory

    C. Processor sparing, SIMD, CPACF

    D. CPACF, I/O redundancy, Capacity on Demand

  • Question 19:

    A z14 customer has expressed interest in deploying firmware and software appliances on IBM Z.

    What feature will enable the customer to achieve their goal?

    A. Linux on IBM Z running under z/VM

    B. IBM Db2 Analytics Accelerator (iDAA) on IBM Z

    C. zHyperLink

    D. Secure Service Container (SSC)

  • Question 20:

    Which of the following planning considerations is required when ordering the 16U reserved feature?

    A. Order the number of I/O cables that will be needed.

    B. Plan for the number of rack-mounted disks.

    C. Order a MES for the third of fourth PCle+ I/O drawer.

    D. Plan for the number of power cords required.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-038 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.