Exam Details

  • Exam Code
    :C8060-218
  • Exam Name
    :IBM Sterling B2B Integrator V5.2 Solution Implementation
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :104 Q&As
  • Last Updated
    :Apr 16, 2025

IBM IBM Certifications C8060-218 Questions & Answers

  • Question 81:

    While gracefully stopping the system in a controlled manner, IBM Sterling B2B Integrator (SBI) has the ability to control the completion of which type of queued items on the local node?

    A. FIFO messages

    B. Mailbox messages

    C. ActiveMQ messages

    D. Business Processes (BP)

  • Question 82:

    A company is onboarding a new group of trading partners with high volumes and is expecting increased interaction between IBM Sterling B2B Integrator (SBI) and the database. What is one thing that should be done to efficiently handle the increased database interaction?

    A. Create a Service Group of database connections.

    B. Create additional Lightweight JDBC Service configurations.

    C. Increase the maximum connections in the connection pool.

    D. Increase the maximum connections in the Lightweight JDBC Service configuration.

  • Question 83:

    For increased availability reasons, a two-node application cluster has been multi-homed with each node having two network adapters cards. The system needs to be enabled to accept inbound FTP or FTP SSL client connection on port 25000. The system will use a wildcard (*) default in the perimeter server. How many FTP server adapters need to be configured to support ACTIVE and PASSIVE user initiated seasons?

    A. 2

    B. 4

    C. 8

    D. 16

  • Question 84:

    A customer has moved the IBM Sterling B2B Integrator (SBI) database server to a new ipaddress/ hostname and needs to make the changes to SBI so that it can connect to the new server. Which procedures should be followed?

    A. Edit /properties/sandbox.cfg and change all old database ipaddress/hostname to the new one, save and run setupfiles.sh.

    B. Edit /properties/jdbc.properties.in and change all old database ipaddress/hostname to the new one, save and run setupfiles.sh.

    C. Edit /properties/jdbc.properties and change all old database ipaddress/hostname to the new one, save and run setupfiles.sh.

    D. Edit /properties/jdbc_customer.properties.in and add all database pools into this file with new ipaddress/hostname, save and runsetupfiles.sh.

  • Question 85:

    When switching between editing a Business Process (BP) in the Graphical Process Modeler (GPM) and the text editor, some meta data is lost. What meta data will be retained regardless of the switch?

    A. BP execution settings

    B. graphical layout of the BP

    C. custom name set on services/adapters

    D. annotations (comments) on services/adapters

  • Question 86:

    Where are two places the amount of time a Business Process (BP) remains online in the system can be updated? (Choose two.)

    A. Archive Manager

    B. archive.properties

    C. Business Process Editor

    D. Performance Tuning Wizard

    E. Retention Service configuration

  • Question 87:

    A company has installed a larger drive on their IBM Sterling B2B Integrator (SBI) server and want to change the location of their archived data to this new drive. Where is the default directory for archive data set?

    A. Archive Manager

    B. Performance Tuning Utility

    C. Archive Service Configuration

    D. customer_overrides.properties

  • Question 88:

    A global persistence level is set to PERSISTENCE_NONE. Which Business Process (BP) persistence settings will result in more information being persisted?

    A. System Default

    B. Step Status Only

    C. Step Status - Engine May Override

    D. BP Start Stop - Engine May Override

  • Question 89:

    A company allows HTTP communication from trading partners. What must be configured on the HTTP Server adapter to allow a Business Process (BP) to be invoked to handle incoming HTTP requests?

    A. URI

    B. WAR file

    C. Input schema

    D. CA Certificate

  • Question 90:

    A developer is implementing onFault logic into a Business Process (BP) for error handling. Given the following BPML code containing two onFaults:

    How will the onFault execute for the error "XML failed validation"?

    A. Execute both faults.

    B. Execute neither fault.

    C. Execute the first fault.

    D. Execute the second fault.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C8060-218 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.