What are three ways a new work item can be created? (Choose three.)
A. from an existing work item
B. from the RTC Screenshot tool
C. from an incoming email
D. from a build result
The Jazz Team Build system can integrate with which three build or continuous integration systems? (Choose three.)
A. Maven
B. Hudson/Jenkins
C. BuildForge
D. Subversion
E. Eclipse
A user discovers they have outgoing pending changes they did not make. What is the most likely explanation?
A. Someone else delivered changes to the user's repository workspace.
B. Someone reverted changes that the user had already accepted in their repository workspace.
C. The team lead changed the baseline of a component on the integration stream to which the user's repository workspace delivers its changesto.
D. A new component was added to the integration stream that the user's repository workspace delivers its changes to.
What are the key components of the reporting solution?
A. Templates and pdf document generator
B. Application data storage and data warehouse
C. Reverse proxy server and security certificate
D. Build agent and the build system toolkit
In a work item comment, a practitioner types in "defect 2632". Given that there is an existing work item with the ID number 2632, which statement is true?
A. The current comment is copied and added as a comment to "defect 2632".
B. A parent-child relationship is created between the current work item and "defect 2632"
C. A link to "defect 2632" is created, and a click on the link opens the corresponding work item.
D. The content of "defect 2632" is copied into the current comment.
What does the permission indicated below in the Team Configuration of a Project Area Editor allow role members to do? Team Configuration-> Source Control->Replicate change sets- >replicate
A. replicate change sets to another user's workspace
B. deliver changes to a flow target on a different RTC server
C. deliver automatically all the changes made in a workspace
D. replicate the profile of a user on another RTC server
What are the distinct types of dashboards?
A. Project, Team, Personal, and Mini
B. Web, Eclipse, Workbench, and Visual Studio
C. Lifecycle, Full, Partial, and Mini
D. Public, Private, Semi-private, and Shared
Which statement is true about the structure of a project area?
A. A project area may contain a team area
B. A project area can contain only one timeline
C. A project area is contained in a team area
D. A project area is included in a timeline
A user creates a plan for a project by using the Formal Project Management process template. What is used to define temporal relationships between tasks that are logically related?
A. resource leveling
B. plan attributes
C. schedule constraints
D. schedule dependencies
Which two items/objects can own a component? (Choose two.)
A. A user
B. An iteration
C. A source file D. A team area
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C9510-820 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.