Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions
and create maintenance orders automatically.
What must you do in Customizing?
A. Define field values for PM/PS Reference Element
B. Define transfer of project or investment program
C. Create a revision type and select WPS-Controlled.
D. Create a revision type and select Not WPS-Controlled.
Your customer wants to use the dynamic availability check for stock material. What data must you use to create a scope for the check?
A. Checking group and material type
B. Checking rule and material type
C. Checking rule and material group
D. Checking group and checking rule
Your customer uses operating hours to execute a performance-based maintenance plan. Which of the following data must you assign in the maintenance plan header?
A. A task list for performance-based maintenance
B. A cycle unit of measure with a corresponding characteristic from the measuring point
C. An order type for performance-based maintenance
D. A technical object with a measuring point
What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two)
A. The performing work center must have available capacity data.
B. The performing work center must have a control key with the Determine Capacity Requirements indicator set.
C. The numeric value for Work in the order operation must be greater than 0.
D. The operation must have a control key with the Determine Capacity Requirements indicator set.
In order costing configuration, for what is the allocation structure used?
A. To provide a method of consolidating costs in the Plant Maintenance Information System
B. To allocate costs to a hierarchy of maintenance technical objects
C. To determine the cost elements that are allowed in the plant maintenance order
D. To determine the settlement receMng elements for costs debited to the order
What are the purposes of technical object structures? (Choose three)
A. To support Asset Accounting in the description of fixed assets
B. To display the total number of an asset's individual parts from a design engineering perspective
C. To identify objects and object parts for maintenance
D. To collect historical data for maintenance objects
E. To enable detailed cost analyses
How many time-based cycles can you use in a multiple-counter maintenance plan?
A. Three
B. Zero
C. Two
D. One
Which account assignment category can you specify in a settlement profile?
A. Maintenance planning plant
B. Functional location
C. Equipment
D. Material
You have selected Confirmation Required in the control key for operations in a maintenance order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose
three)
A. TECO
B. PCNF
C. CRTD
D. CNF
E. CLSD
Which of the following is a benefit of SAP Solution Manager?
A. It reduces the cost of implementation and continuous improvement.
B. It enables central SAP NetWeaver Enterprise Search within all SAP systems.
C. It provides common master data management within all SAP systems.
D. It reduces the number of systems and operates only one central IT landscape.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TPLM30_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.