  • Question 61:

    Which ONE of the following statements about state transition testing is correct?

    A. All transitions between states are explicitly shown in the state table.

    B. Usually it is not possible to create tests to cover all transitions and all states.

    C. The size of the state table depends on the number of possible transition between the states.

    D. The state transition diagram explicitly shown all invalid transitions

  • Question 62:

    Which of the following statements is correct?

    A. Because independence of testers enhanced quality and improves testing, test planning should not take into account constraints from the development team.

    B. Since test planning is influenced by the developers work, test planning should not start before the entire project plan of the development team is available

    C. Test planning is an activity that is only performed at the very beginning of the project

    D. Test planning is influenced by, among others, the scope of testing, the risks and the availability of resources.

  • Question 63:

    Which of the following does NOT describe a reason why testing is necessary?

    A. The customer decided that 100% branch coverage shall be achieved

    B. The risks associated with delivering the system are far higher than the cost of testing

    C. For avionics and pharmaceutical systems software testing is mandated by standards

    D. The acquisition of test automation tools was based on the assumption that it will be used in all projects

  • Question 64:

    Which of the following statements about test automation is CORRECT?

    A. When using data-driven testing, testers create and store test inputs separately from the test script allowing the same test script to be run with different data sets

    B. Test management tools should not interface with other testing tools as they are only required for use by the test manager

    C. When performing automated static analysis, warning messages that do not stop the code from being compiled and translated into an executable program, should be ignored

    D. In keyword-driven testing specific keywords are included in scripts to indicate to the tester that they must enter a particular value at that point

  • Question 65:

    Which of the following statements is not correct?

    A. Testing is often seen as a destructive activity instead of constructive activity

    B. Looking for defects in system requires professional pessimism and curiosity

    C. Identifying defects may be perceived as criticism against product

    D. Looking for defects in a system may require ignoring system details

  • Question 66:

    Test Driven development means

    A. Development progress is allowed only upon successful completion of tests in previous stage

    B. Automated tests written by test engineers

    C. An approach in which test cases are written and sometimes even automated before coding

    D. Development of test cases by programmers rather that test engineers

  • Question 67:

    Which of the following statements regarding inspection is NOT true?

    A. The main purpose of an inspection is to find solutions to the problems.

    B. An inspection can be performed by peers.

    C. An inspection may be led by a trained moderator who shall not be the author.

    D. An inspection shall follow a formal process based on rules and checklists with entry and exit criteria

  • Question 68:

    Which of the following is a characteristic of white-box techniques?

    A. Models, either formal or informal, are used for the specification of the problem to be solved, the software or its components.

    B. Test cases are derived from functional and non-functional requirements.

    C. The knowledge of testers, developers, users and other stakeholders about the software, its usage and its environment is one source of information.

    D. The extent of the code coverage can be measured for existing test cases, and further test cases can be derived systematically to increase coverage.

  • Question 69:

    What is an inspection?

    A. A review conducted by an external auditor.

    B. A rigorous review technique aimed at identifying defects.

    C. An informal review of code or documents performed by colleagues.

    D. An activity which can be scheduled before an Acceptance test.

  • Question 70:

    Which of the following are valid testing principles?

    I) Exhaustive testing is in general impossible.

    II) Exhaustive testing should be executed for code intended to be reused.

    III) Testing may guarantee that a program is correct.

    IV) Testing cannot guarantee that a program is correct.

    V) Defects cluster together in certain areas of the product.

    A. I, IV, V

    B. I, V

    C. I, III

    D. II, IV

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CTFL-FOUNDATION exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.