You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
C. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
B. Unicode conversion SAP S/4HANA conversion including database migration
C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
D. SAP S/4HANA conversion including database migration and Unicode conversion
E. Unicode conversion Database migration SAP S/4HANA conversion without database migration
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
A. The source system is non-Unicode and the target database is a scale-out system.
B. The target database size increases temporarily because of the Shadow Repository.
C. SAP HANA Landscape Reorganization required a manual step to edit a file.
D. Network capacity between exporting and importing R3load processes must be.
E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
A. The SAP support packages that will be bound to the conversion
B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
C. The SAP support packages of the support package stack, calculated by the maintenance planner
D. The SAP support packages in the download directory that are newer than the selected support package stack
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
A. Kernel for target release, Windows, SAP MaxDB
B. Kernel for target release, Linux, SAP HANA
C. Kernel for target release, Windows, SAP HANA
D. Kernel for source release, Windows, SAP MaxDB
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
A. Keep archiving on during the whole procedure.
B. Use the Near Zero Downtime Maintenance Technology (NZDM).
C. Reuse a profile for the shadow instance from a previous run.
D. Choose the instance number of the shadow instance.
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
A. Shadow on target creation
B. Downtime conversion
C. Silent data migration (SDM)
D. Downtime migration
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
A. Before the downtime starts
B. At the end of the downtime
C. As part of the cleanup process
D. Early in the downtime
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
A. To optimize the migration
B. To optimize the activation
C. To optimize the conversion
D. To optimize the main import
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
A. SYCM (Simplification Database Content)
B. SAT (Runtime Analysis)
C. ATC (ABAP Test Cockpit)
D. SE80 (Object Navigator)
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your E_S4HCON2022 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.