Huawei Huawei Certifications H19-311 Questions & Answers

  • Question 21:

    Which of the following statements are correct about the UPS5000-A (30-120 kVA) reliability? (Multiple Choice)

    A. 6 kV/5 kA lightning protection design

    B. Wide input voltage range

    C. High inverter overload capability

    D. Conformal coating technology

  • Question 22:

    Which of the following elements shall be considered when configuring a UPS? (Multiple Choice)

    A. UPS model, capacity, and parallel system mode

    B. Battery brand and capacity

    C. Brand and model of the AC and DC cables

    D. Configuration of the battery rack and battery switch box

  • Question 23:

    Which of the following models can be equipped with external high capacity battery charger for rapid recharge?

    A. UPS5000-A

    B. UPS5000-E

    C. UPS2000-A 6/10K professional standard

    D. UPS2000-G 6K extended

  • Question 24:

    The typical aisle type for the FusionModule800 is ().

    A. Hot aisle

    B. Cold aisle

  • Question 25:

    Which of the following are the features of the PDU for the UPS2000-G series (6 kVA to 20 kVA)? (Multiple Choice)

    A. The PDU implements input/output power distribution for two UPSs in parallel.

    B. The PDU provides a central maintenance bypass for a stand-alone system or parallel systems.

    C. The PDU uses an extension output socket with the following specifications: OT; 4 x C13; 2 x C19.

    D. The PDU monitors the surrounding environment and generates an alarm when an error occurs.

  • Question 26:

    The output power factor of the UPS2000-A series (1 kVA to 3 kVA) is ( ).

    A. 0.7

    B. 0.8

    C. 0.9

    D. 0.99

  • Question 27:

    The UPS2000-G series (6 kVA to 20 kVA) has the () user interface, which displays the system status in real time.

    A. LED

    B. LCD

    C. Touchscreen

    D. Remote NMS

  • Question 28:

    The maximum output power factor of the UPS5000-E can be (), which support another 11% loads than traditional UPSs.

    A. 1

    B. 0.9

    C. 0.95

  • Question 29:

    Which of the following functions and components are configured for the standard UPS5000-E (50 kVA power module)? (Multiple Choice)

    A. SNMP function

    B. Dry contact communication card

    C. Functions of a parallel system

    D. BSC

  • Question 30:

    A UPS with a high input power factor allows for effective power grid utilization and reduced power grid interference. The input power factor of the UPS2000-A series (1 kVA to 3 kVA) is ().

    A. 0.85

    B. 0.9

    C. 0.95

    D. 0.99

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Huawei exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your H19-311 exam preparations and Huawei certification application, do not hesitate to visit our Vcedump.com to find your solutions here.