Exam Details

  • Exam Code
    :HPE0-S22
  • Exam Name
    :Architecting Advanced HPE Server Solutions
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :96 Q&As
  • Last Updated
    :Mar 28, 2025

HP HP Certifications HPE0-S22 Questions & Answers

  • Question 41:

    A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GB of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the MS-SQL database is performing poorly.

    After extensive performance trending analysis, it is determined that the database front-end I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess 30ms at critical times.

    Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?

    A. Increase the memory on the blades to 2TB.

    B. Install SSD drives local to the BL460c.

    C. Install an HPE IO Accelerator on the blade.

    D. Add Adaptive Optimization licensing.

  • Question 42:

    A customer has an HPE Integrity Superdome X solution. The customer requires flexible nPartitions that IT staff can quickly build at different times based on a pre-defined template.

    Which approach should the architect recommend the customer take to meet this requirement?

    A. Create nPartition configs using the iLO GUI for the HPE Integrity Superdome X blades.

    B. Create nPartition build plans in HPE Insight Control server provisioning (ICsp).

    C. Create server templates in HPE OneView 2.0.

    D. Create ParSpecs in the HPE Superdome Onboard Administrator (SD OA).

  • Question 43:

    An architect needs to demonstrate the financial advantages of a proposed HPE server and Hypervisor- based solution compared to a legacy server environment that has traditional servers and desktops.

    Which tool should the architect use?

    A. Hyperscale Business Value Calculator

    B. Client Virtualization ROI Calculator

    C. HPE Business Technology Optimization

    D. HPE Business Process Monitor

  • Question 44:

    What defines lease rate factor (LRF)?

    A. the sum of all costs incurred

    B. the periodic rental payment, expressed as a percentage of equipment cost

    C. the cost of the direct capital expenditure, divided by the expected lifespan of the equipment

    D. the expected time to recover the initial investment

  • Question 45:

    A customer is planning to migrate from a Virtual Connect Enterprise Manager (VCEM) environment to HPE OneView. Which topic should the architect discuss with the customer before the migration is implemented?

    A. that HPE OneView Advanced licenses should be added to the appliance prior to the migration

    B. that direct migration from the VCEM is not possible and the customer should plan to remove VC Domain from VCEM first

    C. that migration to the HPE OneView will replace existing WWNs and MAC addresses with new ones, assigned by HPE OneView

    D. that additional one-time-use licenses are required for migration

  • Question 46:

    A customer has 1,000 virtual machines that run on VMware ESXI servers. The customer is concerned that some of the virtual machines may be oversized, which could affect the other virtual machines. Which HPE product should the architect recommend to help the customer with infrastructure sizing, to improve efficiency, and to reduce cost?

    A. HPE Operations Analytics for HPE OneView

    B. HPE Insight Control

    C. HPE Helion CloudSystem 9

    D. HPE Cloud Optimizer for HPE OneView

  • Question 47:

    An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.

    Which configuration change should the architect recommend to ensure a loop free management topology?

    A. Remove one iLO connection from each HPE Apollo 6000 chassis.

    B. Configure MAD between the top-of-rack switches.

    C. Replace the top-of-rack switches with HPE Advanced Power Management Kits.

    D. Configure IRF between the top-of-rack switches.

  • Question 48:

    An architect explains a software-defined data center (SDDC) concept and its benefits to a customer. The customer indicates an interest and so the architect needs to verify whether the customer is ready to move to the SDDC. Which additional information should the architect obtain from the customer to verify this?

    A. whether they already virtualize compute and storage resources

    B. whether they have a disaster recovery plan implemented

    C. whether they have standardized on a single vendor

    D. whether they have a workplace mobility plan implemented

  • Question 49:

    During a data center transformation discussion, an architect obtains the following customer information:

    1.

    core business depends heavily on advanced data modelling techniques that has been developed internally

    2.

    infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for the various development teams that rely on them

    3.

    has a proud reputation as an "environmentally friendly" Fortune 500 company

    4.

    increasing productivity of its development team is the highest priority

    Which large scale HPC solution should the architect recommend to help the customer achieve its transformation goals?

    A. HPE Apollo 8000

    B. HPE Integrity Superdome X

    C. HPE Apollo 2000

    D. HPE Apollo 6000

  • Question 50:

    View the Exhibit.

    Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three

    seconds. The architect has implemented a POC and tested a single cartridge with different numbers of user sessions.

    The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max."

    What should the architect conclude from this test?

    A. CPU becomes a limiting factor around 50 sessions, so the architect should propose at least one cartridge per 45 or 50 users.

    B. None of the monitored resources shows signs of being a bottleneck, so the architect should consider other factors such as the HPE Moonshot switch module.

    C. The network adapter becomes a bottleneck before other resources, so the architect should propose m710p cartridges, which provide 10GbE ports.

    D. The memory becomes a bottleneck before other resources, so the architect should propose m400 cartridges, which provide a higher memory capacity.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-S22 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.