Exam Details

  • Exam Code
    :NCSE-CORE
  • Exam Name
    :Nutanix Certified Systems Engineer Core
  • Certification
    :Nutanix Certifications
  • Vendor
    :Nutanix
  • Total Questions
    :197 Q&As
  • Last Updated
    :Mar 31, 2025

Nutanix Nutanix Certifications NCSE-CORE Questions & Answers

  • Question 141:

    Refer to Exhibit: An administrator logs in to Prism and sees the status shown in the exhibit within the

    Hardware Diagram section.

    What should the administrator do?

    A. Reseat all disk immediately. If this does not help, reseat the nodes.

    B. Check status of applications running on the cluster and call support.

    C. Resolve all alerts and re-import the disks to make sure there is no service disruption.

    D. Restart all CVMs for the cluster to check, confirm health and repartition and add the disks.

  • Question 142:

    An administrator knows that the disk in a cluster are out of date and a new firmware is available. For security reason, these cluster do not have access to the internet. Which two steps must be completed to update the firmware? (Choose two.)

    A. Download the update firmware .tgz file from the Nutanix Portal.

    B. Download the dark site bundle and stage it on an internal webserver

    C. Configure LCM with a URL to access the firmware bundle.

    D. Select Upgrade Software, then select disks and upload the updated firmware.

  • Question 143:

    A prospective customer wants to refresh their current on-premises infrastructure that. consists of 4 ESXi hosts. each with 20 cores and 512GB of RAM, and 1.2PB of usable SAN storage They have recently renewed their ESXi licensing, and all data must remain within their physical network. They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses. Which Nutanix capability should the systems engineer review with the customer?

    A. Replace the hypervisor with AHV

    B. Build Cluster on a public cloud

    C. Position storage-only nodes

    D. Use Volumes to provide storage

  • Question 144:

    A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials:

    1.

    3 Hosts

    2.

    2x E5-2640v4 CPUs

    3.

    512GB RAM

    4.

    1 x 480GB SSD

    5.

    2 x 8TB HDD

    6.

    2 x 1GB NIC

    What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)

    A. Sizing data from the competition was shared.

    B. There is no visibility to the actual customer requirement

    C. The assumptions made in the competitor's sizing cannot be determined.

    D. Nutanix Collector is better at capturing the metrics needed

  • Question 145:

    An administrator needs to report on any alerts generated by a Nutanix cluster that affected the cluster's availability over the past 10 days. Which method should be used to locate these events?

    A. On the Health dashboard, use the Log Collector to export data based on time stamp.

    B. Export the cluster event log to a CSV on the Alerts dashboard.

    C. On the Alerts dashboard, filter based on Impact Type and the desired Time Range.

    D. Configure an Alert Policy to generate an email with the data on the Health dashboard.

  • Question 146:

    Refer to the exhibit.

    ***Exhibit is Missing***

    Based on the sizing scenario, what level of resiliency can be inferred about the configuration?

    A. FTT1

    B. N+0

    C. N+1

    D. N+2

  • Question 147:

    An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.

    Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?

    A. 15 TB.

    B. 24 TB

    C. 37 TB

    D. 39 TB

  • Question 148:

    During a sales motion with a new prospect, the prospect asks to do a POC so they can experience Nutanix in their environment. What is the most important item the SE must have in place with the prospect before moving forward with a POC?

    A. Start date of the POC

    B. Defined and measurable success criteria

    C. Meeting frequency

    D. Number of Nodes/Block to be used during the POC

  • Question 149:

    Which two items are considered by Sizer when calculating the required cluster resources with only the Raw input workload type for a multi-VM workload? (Choose two)

    A. The vCPU:pCore ratio applied for specific VMs

    B. Large VM NUMA requirements

    C. The required RAM for the CVM

    D. The vCPU:pCore ratio applied to all VMs

  • Question 150:

    During a sales motion with a new prospect, the prospect and SE agree to evaluate Nutanix and a computing platform using XRay.

    The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity. Which two details must be discussed with the prospect before the POC starts? (Choose two)

    A. Model of Fibre Channel switch

    B. Gather details of customer's existing 3-tier hardware

    C. ldentify appropriate POC hardware

    D. A test plan with agreed upon success criteria

    E. What type of external storage will be connected

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Nutanix exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your NCSE-CORE exam preparations and Nutanix certification application, do not hesitate to visit our Vcedump.com to find your solutions here.