  • Question 101:

    Which data collection tool would be used for obtaining detailed information about hosts that are attached to ONTAP storage?

    A. Upgrade Advisor

    B. OneCollect

    C. Brocade Network Advisor

    D. Conflg Advisor

  • Question 102:

    Which two components must be verified for a supported NetApp SAN confutation? (Choose two.)

    A. host memory

    B. host GPU

    C. host multipath

    D. host bus adapter

  • Question 103:

    You want to access and mount a Linux L.UN using only iSCSl. In the past, the LUN ha;; been accessed using FC. What must you do to accomplish this task?

    A. Change the LUN protocol type to (SCSI.

    B. Create a new iSCSI igroup. and change the LUN mapping from the original to the new igroup.

    C. Create a new iSCSI Igroup and map the LUN to both the new and existing FC igroup.

    D. Add an iSCSI protocol type to the existing igroup so that the LUN can be accessed by both FC and iSCSI hosts.

  • Question 104:

    Exhibit.

    You want to configure a UTA2 port as an FCoE target. Referring to the exhibit, which action must be performed?

    A. Configure the port mode as CNA.

    B. Configure the port mode as Ethernet.

    C. Configure the port type as initiator.

    D. Configure the port mode as FC.

  • Question 105:

    You are planning few a new AFF A700 2-node switchless FC solution with two Cisco 9100 switches. Each AFF A700 will have one 16 Gb port Connected to each Cisco 9100 switch and four FC LIKs per physical port. You want to guarantee recovery from connection loss on a NetApp physical port and you are using single initiator to multiple target zoning. What is the minimum number of zones required to accomplish this task?

    A. 8

    B. 4

    C. 2

    D. 1

  • Question 106:

    An administrator is migrating from a third-party's SAN to a newly purchased FAS9000. The administrator decides to use the NetApp Foreign LUN Import (FL1) process. What must the administrator do for this process to work properly?

    A. Create multiple igroups for the Initiator ports.

    B. Create six distinct zones that include specific ports within each zone.

    C. Zone target ports of source storage with initiator ports of destination storage.

    D. Make the destination LUN larger than the foreign LUN.

  • Question 107:

    Exhibit.

    You are asked to change the iSCSl Target Node Name of an SVM named SVM1 that is serving data. Referring to the exhibit, which two statements are correct? (Choose two.)

    A. Reconnect all the lUNs alter renaming the target node.

    B. Disable Selective LUN Mapping (SIM) and create port sets.

    C. Unmap and re-map the LUNs.

    D. Stop and start the iSCSI service.

  • Question 108:

    Exhibit.

    An administrator has an AFF A200 HA pair.

    Referring to the exhibit, how many 10 Gbps connections would the customer have on a single node for

    SAN host connectivity?

    A. 4

    B. 6

    C. 7

    D. 2

  • Question 109:

    Exhibit.

    Dining a data mobility test on a 4-node ONTAP 9.3 cluster, the host loses direct access to its LUNs. The LUNs are hosting on node cl1-01 and are being moved to cl1-03 on a different HA pair. Referring to the exhibit, which corrective step is needed to ensure access while the volume is moved?

    A. Add reporting nodes for cl1-03 and cl1-04.

    B. Create additional LIFs on cl1-01 and cl1-02.

    C. Create a new destination volume on cll-03.

    D. Create new igroups on cl1-03 and cl1-04.

  • Question 110:

    You have a 4-node FAS8200 A300 cluster that are using ONTAP 9.3 default settings. For faster performance, you move a volume with LUNs from a node on the FAS8200 to a node on the AFF A300. You determine that your SAN host is still using all active/optimized FC paths to the FAS8300 HA pair. What do you need to troubleshoot to move all active/optimized FC paths to the AFF A300 HA pair?

    A. reporting nodes list

    B. host MPIO and ALUA

    C. LUN mapping

    D. igroup WWPNs

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only NetApp exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your NS0-509 exam preparations and NetApp certification application, do not hesitate to visit our Vcedump.com to find your solutions here.