See the following specification:
How many test situations can be distinguished for this specification when the coverage type decision points modified condition/decision is used?
A. 2
B. 6
C. 8
D. 64
During the test execution of a large customer registration system, the system went down for several times. Although there were no test cases described the tester concluded that the continuity was poor. Which testing method is described here?
A. dynamic explicit testing
B. dynamic implicit testing
C. static testing
See the illustration below:
In order to test a registration application for a weekend trip, logical test cases must be created according to the Data Combination Test. It is agreed to conduct light testing. One data pair is defined that must be fully tested in combination:
-day ?attraction
Using a classification tree, six test cases are designed.
Where should the 'bullets' for test case 4 be placed?
A. Saturday, zoo, 2nd
B. Sunday, zoo, family car
C. Sunday, zoo, 2nd
When customer data is entered, it is mandatory to specify an e-mail address. Which test design technique can be used to test the above?
A. Data Cycle Test
B. Process Cycle Test
C. Syntactic Test
There are two parties in the V model:
-
the supplying party
-
the accepting party
Which system development phase or test phase is not performed by the supplying party?
A.
Functional design
B.
Realization
C.
System test
D.
Technical design
Is the checklist drawn up for the purpose of the basis evaluation dependent on the test design technique being applied?
A. Yes
B. No
See the specifications below:
How many test situations are generated if the coverage type decision points with decision coverage (as part of the elementary comparison test) is used?
A. 3
B. 4
C. 6
D. 8
What does a software engineer have to demonstrate at the very least during development testing?
A. That the product meets the functional specifications
B. That the product meets the non-functional specifications
C. That the product meets the technical specifications
D. That the product meets expectations
Business-driven test management allows the business client to control the test process and help determine the test approach. Which aspects can the client control?
A. The balance between results and risks versus time and costs.
B. The quality of the test object.
C. The test design techniques to be used.
D. Reducing the probability of software failure.
Which of the following may be a consequence of not performing a pretest?
A. A degradation in quality of the test basis.
B. An increase in the number of test cases.
C. Loss of time during the test execution.
D. Increased risk of damage during production.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EXIN exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your EX0-113 exam preparations and EXIN certification application, do not hesitate to visit our Vcedump.com to find your solutions here.