Which activity is not part of the Completion phase?
A. updating the testware to be preserved
B. assessing test results
C. evaluating the test process
D. selecting the testware to be preserved
Which type of tool is used in the Execution phase to test a module or component that has a relationship with programs that have not yet been realized?
A. code coverage tool
B. comparator
C. 'model-based testing' tool
D. stubs and drivers
For the creation of the central starting point there are several techniques. In the given situation it is necessary that consistency between the data entered is guaranteed. Which of the techniques below is preferable if only one technique may be used?
A. use of production data
B. entering through separate front-end software
C. entering through regular system functions
See the definition below: The ease with which the information system can be adapted to new requirements of the user and the changing external environment, or to correct errors. Of which quality characteristic is this the definition?
A. manageability
B. flexibility
C. maintainability
See the decision and test situations below:
R = (A AND B) OR C
Which test situation is missing if the coverage type decision points modified condition/decision coverage is used?
A. Option A
B. Option B
In which TMap phase activity does the pre-test take place?
A. Defining central starting points
B. Intake of the test object
C. Specifying the test object intake
D. Executing (re)tests
Which defect has an internal cause that can be solved within the test team?
A. Adefect in the test basis
B. Adefect in the test specification
C. Adefect in the test object
Under which circumstance can Exploratory Testing be used effectively?
A. when experienced testers with domain knowledge are available
B. when testing must be as brief as possible on the critical path of the project
C. when critical functionality, failure of which can cause severe damage, must be tested
See the definition below:
Tests in which the supplying party demonstrates that the product particularly meets the functional and non-functional specifications and the technical design, among other things of which test level is this the definition?
A. acceptance test
B. development test
C. system test
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EXIN exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your EX0-113 exam preparations and EXIN certification application, do not hesitate to visit our Vcedump.com to find your solutions here.