Exam Details

  • Exam Code
    :C1000-031
  • Exam Name
    :IBM Power Systems Scale-Up Technical Sales
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :101 Q&As
  • Last Updated
    :Apr 12, 2025

IBM IBM Certifications C1000-031 Questions & Answers

  • Question 21:

    Which of the following is a feature exclusive to PowerVM Enterprise Edition?

    A. PowerVC

    B. PowerSC

    C. Active Memory Sharing

    D. HMC Virtual Appliance

  • Question 22:

    A customer would like to have the ability to move cores and memory activations between servers inside a pool.

    What kind of activation must be considered?

    A. Trial capacity on demand

    B. Mobile activation

    C. Elastic capacity on demand

    D. Static activation

  • Question 23:

    Which of the following can be moved from a Power System 770 to a Power System E980 when doing a migration?

    A. PCIe 12X I/O drawers #5802/5877

    B. EXP30 SSD I/O drawer

    C. EXP24S SAS Storage Enclosure

    D. Memory DIMMs

  • Question 24:

    A customer is evaluating options for a new system to handle a rapidly growing workload. Initial requirements are for 16 cores and 1TB, and growth expected to be 15% per year.

    Why should Enterprise Power Systems be marketed over Scale-out systems to this customer?

    A. They have PCIe controllers integrated into the processor.

    B. They support CAPI.

    C. They support hot plug adapters.

    D. They support CoD.

  • Question 25:

    A customer has ordered Capacity on Demand (CoD) for their server, and would like to implement it in their environment.

    To use CoD, they download an activation code from the IBM:

    A. CoD website and enter it using the HMC.

    B. CoD website and enter it into the partition profile.

    C. Entitled System Support website and enter it into the partition profile.

    D. Entitled System Support website and enter it using the HMC.

  • Question 26:

    A customer wants to provide redundant links to their network switches to increase bandwidth and availability.

    This technique is referred to as:

    A. VLAN tagging.

    B. Shared Ethernet Adapter.

    C. Network Interface Backup.

    D. Link aggregation.

  • Question 27:

    A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of two cores and 32GB memory.

    They now want to do another short test that requires the activation of one additional core.

    Which option provides the most cost-effective solution?

    A. Use Static Activation.

    B. Use Utility Capacity on Demand.

    C. Use Trial Capacity on Demand again.

    D. Use Mobile Activation.

  • Question 28:

    Which of the following statements is true regarding LPAR Mobility?

    A. An active AIX logical partition cannot be migrated from one server to another server by using the System Management Interface Tool (SMIT)

    B. An inactive logical partition may be migrated from one server to another server by using the Partition Migration wizard on HMC.

    C. The HMC command-line interface is required to migrate a Linux logical partition from one server to another server.

    D. A suspended logical partition cannot be migrated from one server to another server.

  • Question 29:

    A customer has a two node Power System E880 with EXP24S Disk Drawers and I/O Drawers used exclusively for dual VIOS local boot.

    How can a Solutions Architect design a POWER9 solution to minimize the physical rack space with an upgrade to a Power System E980?

    A. Change the EXP24S to Mode 4 to allow consolidation to a single EXP24S.

    B. Upgrade the I/O Drawers with SAN boot capable Fibre Channel Adapters.

    C. Configure a single node Power System E980.

    D. Configure NVMe Flash Drives into the Power System E980 nodes.

  • Question 30:

    A customer is interested in running many Linux workloads and they are comparing a single Power System E950 versus multiple LC922 servers.

    An advantage of the Power System E950 is the ability to support:

    A. dual VIOS.

    B. either PowerVM or KVM.

    C. OPAL firmware.

    D. Power Enteprise Pools.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.