Which of the following statements is true regarding Power Enterprise Pools?
A. The XML configuration file can be downloaded from the ESS (My Entitled Systems Support) web site.
B. One Enterprise pool can contain the following machine types: Power Systems E870, E870C, E880C, and E980.
C. Mobile activations can be moved within a pool at any time, without contacting IBM.
D. A minimum of 75% of a system's memory activation can be mobile.
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers.
Which resource provides the SMT2 performance of the two systems?
A. IBM Performance Management for Power Systems
B. IBM Power Systems Performance Report
C. IBM Power Systems Facts and Features
D. IBM Systems Workload Estimator
A customer has four AIX VMs, each running a different application that needs simultaneous read/write
access to the same files.
Which of the following products should be recommended?
A. Power HA Enterprise Edition
B. Spectrum Scale
C. Spectrum Protect
D. Power HA Standard Edition
A customer requires that each client partition have access to two different VLANs. VLAN tagging will NOT
be used in the environment.
There will be four client partitions, each of which will be connected to VLAN1 and VLAN2.
There will be two VIOS.
Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual
VIOS.
What is the minimum number of Ethernet ports that will be required in each VIOS?
A. 8
B. 4
C. 6
D. 2
What is the advantage of NVMe U.2 flash drives on a Power System E980 SAP HANA BW implementation?
A. They can provide internal boot capability for dual VIOS.
B. They allow for Live Partition Mobility of HANA databases through CAPI 2.0.
C. They can provide AIX Preferred Read storage to reduce SAN latency.
D. They can act as an extension to memory for HANA databases.
A customer with a Power System E880C is considering a model conversion to a Power System E980. They currently have Elastic CoD enabled.
Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?
A. Prepay for Elastic CoD usage when placing the upgrade MES order for the Power System E980.
B. Reorder the Elastic CoD enablement features when placing the upgrade MES order for the Power System E980.
C. Reorder the Utility CoD enablement features when placing the upgrade MES order for the Power System E980.
D. Convert static activations to mobile activations when placing the upgrade MES order for the Power System E980.
Due to an emergency situation, a customer needs to activate all processor and memory resources in a Power System E980 for ten days.
Which of the following could be used to achieve this need with the least possible cost?
A. Elastic CoD
B. Trial CoD
C. Utility CoD
D. Static Activation
Which component of PowerSC monitors AIX systems, maintains security, and provides alerts when a change to the system violates a configuration policy?
A. Trusted Logging
B. Real Time Compliance
C. Security and Compliance Automation
D. Trusted Surveyor
An IBM Business Partner is designing a solution with two POWER9 processor-based servers, an IBM V7000 storage, and IBM SAN switches.
Which of the following will allow them to check the compatibility of software, device drivers, multipathing, and other technical specifications?
A. IBM Facts and Features
B. IBM System Storage Interoperation Center (SSIC)
C. e-config
D. Support web sites of the potential Original Equipment Manufacturers (OEM)
A customer has a significant investment in open source software for performing in-memory analytics. This workload is currently deployed on Linux and recent x86 hardware.
What advantage would a POWER9 processor-based server provide this customer?
A. Faster ChipKill correction rate
B. More cache per core
C. More cores per socket
D. Faster PCIe bandwidth
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.