Exam Details

  • Exam Code
    :C9010-251
  • Exam Name
    :Power Systems with POWER8 Scale-out Technical Sales Skills V1
  • Certification
    :Technical Sales Specialist
  • Vendor
    :IBM
  • Total Questions
    :156 Q&As
  • Last Updated
    :Mar 25, 2025

IBM Technical Sales Specialist C9010-251 Questions & Answers

  • Question 91:

    A customer running AIX wants to run DB2 on a new S824 server with uncapped partitions. The customer has licensed DB2 for 15 of the 24 active cores and will use it in multiple partitions.

    How can the customer ensure that DB2 does not exceed the number of licenses purchased?

    A. Create 15 shared processor pools for the DB2 partitions.

    B. Limit the number of virtual processors on each DB2 partition to 15.

    C. Use partitions that cannot use more processor capacity than its assigned processing capacity for the DB2 partitions.

    D. Use a 15-core shared processor pool for the DB2 partitions.

  • Question 92:

    A customer wants to consolidate AIX, Linux and IBM i workloads. They are also thinking about Analytic

    applications and a small-to-mid-size database.

    Which of the following servers satisfies the customer's requirements?

    A. S822L

    B. S822

    C. S812

    D. S824

  • Question 93:

    A customer wants to move from an IBM Power 740 to an IBM Power S824. The 740 contains:

    (4)

    disks in the CEC

    (10)

    disks in a FC #5802 (I/O drawer with disks)

    (12)disks in a EXP12S

    (24)

    disks in a EXP24S How many disks can be reused with the S824'? How many disks can be reused with the S824'?

    A.

    14

    B.

    38

    C.

    28

    D.

    24

  • Question 94:

    The Payment Card Industry Data Security Standard (PCI DSS) has the following requirements to meet compliance:

    "Secure audit trails so they cannot be altered."

    "Verify that current audit trail files are protected from unauthorized modifications via access control mechanisms, physical segregation, and network segregation."

    Which Power SC offering will support these requirements?

    A. Trusted Network Connect

    B. Trusted Logging

    C. Trusted Audit

    D. Trusted Surveyor

  • Question 95:

    What supports the Easy Tier function for an S822?

    A. (8) drives with a split backplane

    B. (12) drives with a split backplane

    C. (8) drives with a second SAS controller

    D. (12) drives without split backplane

  • Question 96:

    A client needs to analyze data in motion in order to be able to respond to millions of events as they happen per second.

    Which offering will satisfy their requirement?

    A. IBM Info sphere Master Data Management

    B. IBM Info sphere Big Insights

    C. IBM Info sphere Clinical Analytics

    D. IBM Info sphere Streams

  • Question 97:

    What provides a comparison of Power Systems to competitors for applications?

    A. SPECint

    B. RPE2

    C. SPECfp

    D. TPM

  • Question 98:

    A customer has a 4-node cluster serving a few different applications. The storage requirements are not clearly defined and would be very unpredictable.

    How would shared storage pools benefit this customer?

    A. They reduce the total required storage by half.

    B. They eliminate the need for multiple repository disks.

    C. They reduce I/O bandwidth by sharing the LUNs.

    D. They reduce the time and effort needed to allocate storage.

  • Question 99:

    A customer is considering a fully-virtualized infrastructure to be built on Power Systems.

    Which capability would allow storage virtualization, and reduce the effort of adding storage to client partitions for the Power system administrator?

    A. vSCSI

    B. NPIV

    C. SSP

    D. SR-IOV

  • Question 100:

    A customer needs a new server for their database currently running on a 16-core POWER7 4.1 GHz based server. Oracle has informed the customer that their SPARC T5 based servers are best suited for running databases, because the SPARC T5 has eight threads per core, while the current servers only allow for up to four threads per core.

    Which of the following statements could be correctly used to repudiate the Oracle claim?

    A. Databases are mostly single-threaded workloads. Scale-out POWERS servers have higher clock speeds and can scale to more cores than SPARC T5 servers.

    B. Oracle T5 Servers are engineered to run Oracle workloads faster. Non-Oracle workloads will run slower on their hardware due to the amount of threads.

    C. More threads will implicate more licensing for the database software. Less threaded processors provide a better TCO by reducing the licensing.

    D. The number of threads cannot guarantee better performance. Servers based on POWERS have better per core performance in benchmarks when compared to SPARC T5 based servers.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C9010-251 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.