How can system software charges be reduced when migrating from POWER6 to a POWER8 Scale-out server?
A. Only activate the necessary cores.
B. Select the per-socket licensing model.
C. Configure the system with POWER8 Dual-Core Modules (DCM)
D. Disable all un-needed cores with Processor Deconfiguration.
A large manufacturer wants to consolidate their existing AIX and Linux environments to POWER8. The customer has four AIX servers and twelve Ubuntu servers.
Which solution will satisfy the requirements?
A. (1) S822L with Power KVM
B. (1) S822 with Power VM and (1) S822L with Power KVM
C. (1) S822L with Power VM
D. (1) S822 with Power VM and Power KVM
A customer is interested in migrating Little Endian (LE) Linux workloads to POWERS servers running Power KVM.
Which Linux distribution will satisfy the requirement?
A. Ubuntu
B. RedHat
C. CentOS
D. SUSE
A client is considering hardware platforms for their Hadoop implementation.
Which of the following is an advantage of a Power Systems solution over an x86 solution for then implementation?
A. Support for two copies of data
B. Support for the Hadoop File Placement Optimizer
C. Support for IBM Elastic Storage
D. Built-in High Speed Cluster Interconnect
As compared to POWER7/7+, what feature of POWER8 processor technology enables more efficient processor utilization in support of highly threaded applications?
A. Decimal floating point execution
B. Simultaneous Multi-Threading
C. Out of order execution
D. Single precision floating point
A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and utilizing Power HA to a POWER6 2-core server as their backup machine.
The production machine also has unlimited users, IBM i Access users, SOL, and ILE Compilers. They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.
Which of the following is the correct course of action at the least cost?
A. Upgrade the POWER6 to a POWER7. Add two additional IBM i and Power HA Licenses, IBM i and IBM i Access users SQL and ILE Compilers
B. Upgrade both servers to P0WER8 and transfer all the software to the new POWERS servers.
C. Purchase a new POWER8 to replace the POWER6 server and transfer the software from the POWER6 Designate the POWER8 as a CBU to the POWER7.
D. Purchase two new POWER8 servers designating one of them as a CBU. Transfer all the software from the POWER7 to one of the POWER8 servers and all the IBM i and Power HA software from the POWER6 to the other POWER8 server.
Which power option is provided with the S822?
A. (1)1400 Watt 200-240 Volt
B. (2) 1400 Watt 200-240 Volt
C. (2)1400 Watt 125-240 Volt
D. (1)1400 Watt 125-240 Volt
A customer will be consolidating a number of IBM i and AIX partitions from several older servers onto an existing S824 These partitions are parts of various operating groups within the customer and require connectivity to various private networks and network redundancy. The server utilizes SAN Storage and dual VIO Server partitions.
Which solution satisfies the customer's requirements?
A. Add two additional VIO Server partitions each with a quad port Ethernet card. Create an SEA in VIO Server to each port of the Ethernet card. Configure virtual Ethernet connections to the VIO Server partitions for each SEA with one flagged priority
B. Utilize two of the IBM i Partitions to bridge to the outside Attach a quad port Ethernet IOA to each partition and bridge the ports lo internal VLANs needed by the guest partitions.
C. Add two SR-IOV capable Ethernet adapters. Allocate each of them to the partitions and create the connections to the correct VLANs as needed.
D. In the existing VIO Server partitions, add a quad port Ethernet card. Create an SEA in VIOS to each port of the Ethernet card. Configure virtual Ethernet connections to the VIO Server partitions for each SEA with one flagged priority.
Which feature is recommended to move memory resources from one LPAR to another?
A. Dynamic LPAR operation
B. Active Memory Sharing
C. Active Memory Expansion
D. Live Partition Mobility
Which of the following statements is true regarding CAPI?
A. CAP1 allows for adapters like FPGAs and GPUs to bypass the CPU and access the memory directly, allowing for faster data access and reduced CPU utilization
B. CAPI enabled servers use general purpose accelerators that increase the processor clock without compromising stability and RAS.
C. CAPI allows supported third party CPUs (Oracle, Intel, AMD, etc.) to be installed to speed up processing of specific workloads such as big data, compression or Java.
D. CAPI is designed for High-Performance Computing only. Commercial workloads cannot benefit from CAPI acceleration
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C9010-251 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.