Find out the elements responsible for performance management.
There are 3 correct answers to this question.
Response:
A. Investment planning
B. Project definition
C. Execution
D. Dispatch
E. Ordering
In order costing, what is the allocation structure used for? Please choose the correct answer. Response:
A. To provide a hierarchy structure for posting costs to the general ledger
B. To provide a structure to summarize postings across cost elements
C. To determine the cost element for debit to the order and credit from the order
D. To determine the overhead costs that need to be applied to each cost element
What are the 2 options available for archMng order? There are 2 correct answers to this question. Response:
A. ManuaIIy enter historical orders
B. Recognize orders.
C. Order settlement
D. Refurbishment
E. Copy orders
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the
customer need to be aware of? Please choose the correct answer.
Response:
A. Planned costs overwrite estimated costs after release of the order.
B. A specific order type in which cost estimates are activated must be used.
C. Planned costs must not exceed the estimated costs.
D. Upon release of the order, estimated costs cannot be revised.
You have selected Confirmation Required in the control key for operations in a maintenance order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? There are
3 correct answers to this question.
Response:
A. TECO
B. PCNF
C. CRTD
D. CNF
E. CLSD
Your customer wants to settle costs of the refurbishment process to an inventory account.
What Customizing does the process require? There are 2 correct answers to this question. Response:
A. Special control keys for use in refurbishment operations
B. A specific order type for refurbishment processing
C. A specific settlement profile for the purpose of refurbishment
D. A specific notification type for refurbishment processing
Identify the conditions required for Project work There are 3 correct answers to this question. Response:
A. Time
B. Resource
C. Cost
D. Completion
E. Ability to solve issues.
Your customer executes deadline monitoring (transaction IP30). What happens after you insert additional
call dates using the manual call function? Please choose the correct answer.
Response:
A. The system restarts the maintenance plan.
B. The system retains the normal scheduled call dates.
C. The system fixes the next scheduled call date.
D. The system reschedules all previous scheduled call dates.
A maintenance technician replaces a defective counter with a new counter. Before the users can create a
standard measuring document for the new counter, what step(s) must they perform? Please choose the
correct answer.
Response:
A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
A measurement document is the overall term used to describe in system.
Please choose the correct answer.
Response:
A. Data entered
B. Task list
C. Material stored
D. Control panel.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TPLM30_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.