  • Question 71:

    You are running an indirect activity allocation. What do you post to the sender and receiver?

    A. You post only cost to both the sender and receiver.

    B. You post quantity and cost to both the sender and receiver.

    C. You post both quantity and cost to the sender, and cost only to the receiver.

    D. You post both quantity and cost to the receiver, and cost only to the sender.

  • Question 72:

    You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.

    A. Costing-based Profitability Analysis must be active.

    B. Account-based Profitability Analysis must be active.

    C. The type of the addressed ledger must be an extension ledger.

    D. The type of the general ledger account must be primary cost/revenue or secondary cost.

  • Question 73:

    What parameters can you set up when defining order types?

    A. Define document type.

    B. Define default parameters for master record fields.

    C. Define source structure.

    D. Allow revenue postings.

  • Question 74:

    You want enable WIP calculation in Product Cost by Period. What do you need to configure?

    A. Settlement profile

    B. Valuation variant

    C. Profitability Analysis (PA) transfer structure

    D. Variance variant

  • Question 75:

    Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.

    A. Cost of sales

    B. Reserves for unrealized costs

    C. Cost of goods manufactured

    D. Gross margin

    E. Work in progress

  • Question 76:

    Which receiver must be allowed in the settlement profile of product cost collector?

    A. Cost center

    B. Material

    C. Order

    D. G/L Account

  • Question 77:

    You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.

    Actuals of 10000 were posted in the previous year.

    You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.

    How is that possible?

    Note: There are 2 correct answers to this question.

    A. The purchase order has NOT generated a budget yet.

    B. The purchase order was entered in a different year than the budget.

    C. The cost element is exempted from budget availability control.

    D. The difference of 1000 is within the tolerance limits defined in the configuration.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TS4CO_2020 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.