You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
A. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
B. SUM is still running in uptime; the 40 defined Reload processes are considered.
C. Without table contents comparison, only 40 R3load processes are being started.
D. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
B. Combine the upgrade and the Unicode conversion using the Twin Upgrade andUnicode Conversion (TU andUC) procedure.
C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
D. Combine the upgrade and the Unicode conversion using the Combined Upgrade andUnicode Conversion (CU andUC) procedure.
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
A. It performs a comparison on selected tables using check sum.
B. It performs a comparison on all tables using row counts.
C. It performs a comparison of all tables using check sum.
D. It does NOT perform any table comparison.
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
A. DMO with system move
B. Migration repetition option
C. Table count verification
D. Table contents compare
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
A. Credentials of a named user in client 000 of the shadow system
B. Credentials of a named user in the development client of the development system
C. Credentials of user DDIC in client 000 of the shadow system
D. Credentials of user DDIC in the development client of the development system
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question
A. Check the dump size of the database export on disk.
B. Check the Charts Control Center in the SUM Ul
C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
D. Check the log files written in the SUM directory subdirectory abap. subdirectory log
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
A. Parameter file SAPup_add.par
B. Stack XML file calculated by the Maintenance Planner
C. Breakpoint configuration file SAPUPPHAS.BRK
D. MIGRATE J5T_DUR_XML file from a previous run
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. Upgrading to SAP ECC 6.08 without using DMO
B. Using DMO when applying Support Packages to SAP ECC 6.07
C. SAP S/4HANA conversion to SAP S/4HANA 1709
D. Updating to SAP ECC 6.07 using DMO
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
A. SAP S/4HANA conversion including DMO
B. Prerequisite check
C. DMO without system update
D. SAP S/4HANA conversion without DMO
E. Benchmark tool
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your E_S4HCON2023 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.