Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
A. Dual Stack split
B. Support Package Stack update
C. Database migration
D. Release upgrade
E. Homogenous system copy
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
A. Check for running batch jobs in the shadow system via Job Overview (SM37)
B. Check for running R3trans processes on the host of the primary application server
C. Check for running R31oad processes on the host of the primary application server
D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
Unicode migration ECC on MaxDB to HANA in scale out what should we consider?
A. Target DB size will increase temporarily
B. DMO can only be run with systems NW740 or NW731
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable. What could be the reason?
A. The SAP S/4HANA Conversion is without DMO.
B. The SAP S/4HANA Conversion includes a DMO.
C. The start release is too old for DOC.
D. The source database is not supported
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
A. Uninstall industry extensions not supported by SAP S/4HANA
B. Install add-on SAP Gateway 7.50
C. Uninstall Fiori apps not released for SAP_UI 7.50
D. Delete client 066 (Early Watch Client)
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
A. The SAP Support Packages that will be bound to the upgrade
B. The SAP Support Packages contained in the upgrade media
C. The SAP Support Packages found in the download directory
D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
A. The SAP S/HANA Conversion Guide
B. The Application Guide
C. The major SUM Guide
D. The DMO Guide
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
A. Shadow on target creation
B. Downtime conversion
C. Silent data migration (SDM)
D. Downtime migration
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
A. The start of the Execution roadmap step
B. The start of the business downtime
C. The end of the business downtime
D. The end of the database migration
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your E_S4HCON2023 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.