What must an integrator do before an existing cluster can be imported to the HPE Composer?
A. The vCenter Server must be integrated with the HPE Composer
B. The cluster must be vSAN enabled
C. The HPE Composer must have at least two management interfaces to connect to the cluster
D. The cluster must be enabled for HPE Composer integration
Refer to the exhibit.
How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
A. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
B. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
C. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
D. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.
Refer to the exhibit.
An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.
What is the likely cause of this issue?
A. FCoE capable interconnect modules are not installed in the Synergy frame
B. Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
C. A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
D. The FCoE connection has not been added as a Fibre Channel connection within a server profile
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?
A. Enable Remote Support and Insight Online Integration in the Composer UI
B. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
C. Configure OneView with iLO Amplifier pack
D. Activate iLO Federation on all installed compute nodes
During an initial setup of a Synergy environment, an integrator needs to enable or disable authorized Service access.
What will be the outcome when the integrator disables this service?
A. Authenticated administrators will be unable to make changes to the system
B. Authorized users will be unable to generate a support dump
C. Authenticated administrators will be unable to access the system
D. Authorized support will be unable to diagnose the system
FILL BLANK
A customer has the following configuration:
Frame 1 Bay 1
DRAG DROP
Match each HPE server platform with optimal workload.
Select and Place:
DRAG DROP
Match each interconnect device with its appropriate use case.
Select and Place:
HOTSPOT
A customer has the following HPE Synergy solution: three Synergy frames two HPE Virtual Connect SE 32Gb Fibre Channel (FC) modules in each time two HPE Virtual Connect SE 40GB F8 modules four HPE Synergy 10Gb Interconnect Link Modules
Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.
Hot Area:
HOTSPOT
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-S58 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.