  • Question 51:

    What would improve overall utilization of physical memory resources by allowing a group partitions to use a pool of physical memory resources?

    A. Active Memory Sharing

    B. Active Memory Expansion

    C. Active Memory Mirroring

    D. Active Memory Deduplication

  • Question 52:

    A customer consolidated several environments running IBM i, Linux and AIX into a Power System E980. Now the system's installed memory is insufficient. The customer believes that the Active Memory Expansion (AME) feature may resolve the memory issue.

    Which of the following operating systems is capable of using the compression and decompression technology to resolve the issue?

    A. IBM i

    B. Red Hat

    C. SUSE

    D. AIX

  • Question 53:

    A customer wants to configure a Power System E950 with:

    36 physical processor cores

    24 active processor cores

    A partition running AIX with 8 virtual processors and 4.0 processor entitlement.

    A partition running AIX with 12 virtual processors and 7.2 processor entitlement.

    A partition running Linux with 8 virtual processors and 6.4 processor entitlement.

    2 partitions running VIOS, each with 4 virtual processors and 2.0 processor entitlement.

    All partitions are uncapped.

    All processors are in the default pool. No additional Shared Processor Pools are used.

    How many AIX licenses are required?

    A. 24

    B. 12

    C. 20

    D. 36

  • Question 54:

    Which of the following needs to be taken into consideration when designing an IBM Power System E980 solution?

    A. Each system node has eight PCI full-size Gen3 slots which are a mix of x8 and x16 PCIe slots.

    B. A DVD drive must be included in either the system control unit or in a system node.

    C. Redundant SAS controllers in each system node manage all six system node SAS bays.

    D. Only low profile PCIe adapters are supported in the system node.

  • Question 55:

    A customer wants to provision all storage for a particular workload, which will run on 12 individual LPARs in a Power System E980. Their Chief Information Officer is concerned that allocating all the storage to each LPAR individually will lead to lack of storage flexibility in the long term.

    How can shared storage pools benefit this customer?

    A. When storing data on shared storage pools, the data is automatically compressed to take less space.

    B. Shared storage pools automatically move data in the background to where it is needed most.

    C. All the storage will be allocated to the VIOS but can be given to LPARs as required.

    D. Shared storage pools provide automatic data archiving tools that prevent over consumption of the storage.

  • Question 56:

    A client wants to relocate partitions between servers to avoid application downtime during system maintenance or to automatically balance workloads.

    Which offerings provide these capabilities?

    A. PowerHA Enterprise Edition with PowerVM Enterprise Edition

    B. PowerVC Standard Edition with PowerVM Enterprise Edition

    C. PowerHA Enterprise Edition with PowerVC Enterprise Edition

    D. PowerSC Standard Edition with PowerVC Enterprise Edition

  • Question 57:

    A customer runs POWER7+ processor-based servers managed by 7042-CR4 HMCs with V7R7.9.0 firmware.

    The customer will purchase a Power System E980 and wants to manage all servers from the same HMCs.

    How can this be accomplished, if necessary?

    A. Upgrade the code on the 7042-CR4 HMCs V9R9.1.0.

    B. Purchase two 7063-CR1 HMCs.

    C. The current HMCs already satisfy the customer requirements.

    D. MES the existing 7042-CR4 HMCs to 7042-CR9 HMCs.

  • Question 58:

    Which of the following adapters is used to attach a FlashSystem 900 to a Power System E980?

    A. An EDR InfiniBand adapter.

    B. An optical CXP converter adapter.

    C. A 16Gb Fibre Channel adapter.

    D. A 12GB write cache SAS adapter.

  • Question 59:

    A client has a Power System E950 running a critical AIX-based trading application that needs continuous availability during their busy season. They are planning to purchase a second Power System E950.

    Which of the following offerings will provide a solution that will minimize unplanned downtime?

    A. IBM Spectrum Scale

    B. Live Partition Mobility

    C. Dual VIOS in the Power System E950s in a shared storage pool D. PowerHA SystemMirror

  • Question 60:

    A customer is evaluating application software from a third party with versions that can run on both Linux and IBM i. The application requires Db2.

    What benefit should be considered when comparing the TCA of IBM i versus Linux?

    A. Db2 is included in the IBM i OS with no additional cost.

    B. IBM i licenses come with three year base warranty coverage.

    C. Linux licenses are more expensive per core than IBM i.

    D. Db2 on IBM i has individual warranty and maintenance charges.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.