Which of the following is true for systems virtualized with PowerVM?
A. Adapters can be dedicated to LPARs.
B. LPARs require virtual adapters.
C. LPARs require shared memory.
D. Cores must be shared between LPARs.
Where should adapter configurations be validated before adding or rearranging adapters on a Power Enterprise Server?
A. System Planning Tool
B. System SSIC
C. System HMC
D. System Rack Configuration
Amongst which architectures can virtual machines be moved with Live Partition Mobility (LPM)?
A. POWER9, POWER8, POWER7, POWER7+
B. POWER9, POWER8, POWER7, POWER6
C. POWER9, POWER8, POWER7, POWER6+
D. POWER9, POWER8, POWER7+, POWER6+
A customer wants to virtualize their storage environment and would like to use NPIV.
Where will the storage mulltipathing software run?
A. VIOS
B. Storage controller
C. Power Hypervisor D. Client LPAR
Which Ethernet virtualization technique supports Live Partition Mobility on POWER9?
A. vSwitch
B. Standalone SR-IOV without VIOS
C. Proxy ARP
D. SEA
Which capability is used to reallocate memory from one LPAR to another?
A. Live Partition Mobility
B. Active Memory Expansion
C. Dynamic Logical Partitioning
D. Active Memory Sharing
A customer with a Power System 770 and direct SAN I/O is planning a migration to a Power System E980. The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
A. Order new HBAs, but keep using the existing, already configured SAN switches.
B. Order a PCIe Gen3 I/O Expansion Drawer and relocate the HBAs into the drawer.
C. Order new HBAs and modify the WWPNs in the ASMI.
D. Move the HBAs from the Power 770 and install them into the Power System E980 system node.
An IBM I customer has installed a Power System E980 with 32 installed and 20 active cores. They run
VIOS on four cores and three IBM i LPARS in capped mode.
LPAR A uses 8 cores.
LPAR B uses 6 cores.
LPAR C uses 2 cores.
The customer has a requirement to make LPARs A and B highly available and wants to use PowerHA for
IBM i to achieve this.
What is the minimum number of cores that need to be licensed for PowerHA on the primary server?
A. 20 cores
B. 16 cores
C. 14 cores
D. 32 cores
A customer has a 40 core Power System E980 and would like to use Mobile Capacity on Demand.
What is the minimum of static processor activations that are required?
A. 10
B. 12
C. 20
D. 8
An AIX customer is purchasing two new POWER9 processor-based servers: each connected to its own DS8880 at different sites. The customer wants high availability with the least amount of downtime.
Which solution will satisfy the customer's requirements?
A. Combine PowerHA with DS8880 data replication capabilities for automated failover across the sites.
B. Create dual VIOS on each POWER9 and double the total number of adapters in each machine.
C. Use the DS8880 data replication capabilities to replicate the data across the sites. Configure PowerVM Live Partition Mobility for application availability.
D. Use the DS8880 data replication capabilities to perform automated node failover across the sites.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.