  • Question 381:

    An advantage of using standard deviation rather than range for measuring dispersion of a large sample is that:

    A. standard deviation has a simpler formula

    B. calculators have a standard deviation key but not a range key

    C. standard deviation uses information from each measurement

    D. range calculations are not normally distributed

  • Question 382:

    Data are collected in xy pairs and a scatter diagram shows the points are grouped very close to a straight line that tips down on its right hand end. A reasonable value for the coefficient of correlation is:

    A. 0.8

    B. 0

    C. -0.9

    D. 1

    E. 1.3

    F. -1.8

  • Question 383:

    The mean of a Poisson distribution is 2.94. It's variance is:

    A. Not enough information is given

    B. 1.71

    C. 8.64

    D. 74.7

    E. 1.31

  • Question 384:

    Calculate the estimated variance of the population from which the following values have been randomly selected: 2.8 2.7 2.6 2.9 2.8 2.8 2.8:

    A. .095

    B. .009

    C. .088

    D. .008

  • Question 385:

    The distribution is:

    A. symmetric

    B. left skewed

    C. right skewed

    D. normal

    E. uniform

  • Question 386:

    Quality Function Deployment is a tool to aid in:

    A. analyzing non-paired data

    B. determining if quality procedures being followed on the shop floor

    C. ascertaining which processes are functioning correctly

    D. linking customer requirements to product features E. all of the above F. none of the above

  • Question 387:

    A process produced 1394 units. During this time 11 defects were detected. The Rolled Throughput Yield ( RTU) is approximately:

    A. 0.992

    B. 7.89

    C. 0.00789

    D. 1.008

    E. all of the above

    F. none of the above

  • Question 388:

    A project whose definition does not include performance metrics:

    A. will typically be short term

    B. use statistical inference

    C. have a high risk of failure

    D. should not be approved

    E. none of the above

  • Question 389:

    An important step in determining the VOC is:

    A. establish viable or comprehensive process feedback loops

    B. ascertain the principles that are values of the corporation

    C. identify the customer

    D. measure the virtual operating continuum potential

    E. all of the above

    F. none of the above

  • Question 390:

    Dr. Joseph M. Juran:

    A. lectured in Japan after World War II

    B. was an author of several books in the US

    C. lectured widely in the US

    D. is considered an expert is the quality field

    E. all of the above

    F. none of the above

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSBB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.