If item A is more likely to be detected than item B which will have the highest Detection value?
A. item A
B. item B
C. cannot be determined
The formula for reliability during constant failure rate conditions is: Use this formula to find the reliability of a product at 800 hours if MTBF = 600 hours.
A. 0.87
B. 0.78
C. 0.37
D. 0.26
E. none of the above
If item A is more likely to be detected than item B which will have the highest Severity value?
A. item A
B. item B
C. cannot be determined
If item A is more likely to be detected than item B which will have the highest Occurrence value?
A. item A
B. item B
C. cannot be determined
For a line in an FMEA form a team has established the following: Cost: $82 Severity: 7 Occurrence: 9 Detection: 4 Target date: 7 days What should the risk priority number (RPN) be for this line:
A. 144,648
B. 252
C. 1764
D. 63
E. none of the above
"Robust design" refers to the ability of the product or service:
A. to function the same in different conditions
B. to remain strong
C. to last a long time
D. to have a high reliability
The overall tolerance for three components in series in an electrical circuit Is+ 10 . Assuming normal, stable, capable processes produce the components, use stack tolerance techniques to find a set of tolerances for the three components.
A. 3, 3 and 4 respectively
B. 7, 7 and 6 respectively
C. 8, 8 and 8 respectively
D. 10, 10 and 14 respectively
A helpful time to use a Quality Function Deployment matrix is:
A. while planning for a new or redesigned process
B. while planning for new or redesigned parts
C. while planning for a new or redesigned product
D. all of the above E. none of the above
There have been some instances in which 1.5 inch sheet metal screws are used where 1.25 inch should have been used. This produces a critical defect. The decision is made to have all 1.25 inch screws have a square reduced head and all
1.5 inch screws be Phillips. This is an example of:
A. visual factory
B. kanban
C. poka-yoke
D. standard work
E. set up time reduction (SMED)
A meeting is called for all three shifts to determine the settings to be used on machine #45. This is an example of:
A. visual factory
B. kanban
C. poka-yoke
D. standard work
E. set up time reduction (SMED)
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSBB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.