When Tricia empties a box of capacitors she places it at a designated spot on her work table. Sam notices the empty box and brings a full box of capacitors from the stock room. This is an example of:
A. visual factory
B. kanban
C. poka-yoke
D. standard work
E. set up time reduction (SMED)
An assembly line has 3 × 3 squares painted behind each person. Signs indicate the parts and quantities that should be placed there. This is an example of:
A. visual factory
B. kanban
C. poka-yoke
D. standard work
E. set up time reduction (SMED)
An x-bar and R chart has four part measurements per sample The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution. What is the probability that the next part measurement falls outside the control limits?
A. 0.00135
B. 0.0027
C. 0.0681
D. 0.1362
E. 0.2724
F. none of the above
An x-bar and R chart has four part measurements per sample The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution.What is the probability that the next plotted point falls outside the control limits?
A. 0.00135
B. 0.0027
C. 0.0054
D. none of the above
A process shows the following number of defectives. Each sample size for this process is 85.3 8 2 7 7 6 8 8 9 5
Find the control limits.
A. none and 13.5
B. 12.6 and 25.2
C. none and 25.2
D. none of the above
A process shows the following number of defectives. Each sample size for this process is
85.3 8 2 7 7 6 8 8 9 5
What control chart should be used?
A. x-bar and R
B. median
C. individual and moving range
D. p
E. np
F. c
G. u
H. none of the above
A process shows the following number of defects. Each sample size for this process is 85. 3 8 2 7 7 6 8 8 9 5 Find the control limits.
A. none and 13.8
B. 12.6 and 25.2
C. none and 25.2
D. none of the above
A process shows the following number of defects. Each sample size for this process is
85. 3 8 2 7 7 6 8 8 9 5
What control chart should be used?
A. x-bar and R
B. median
C. individual and moving range
D. p
E. np
F. c
G. u
H. none of the above
A process using a p-chart has pbar = 0.076 and nbar = 4.86. Find the control limits.
A. 0.069 and 0.083
B. 0.072 and 0.080
C. 0.040 and 0.112
D. 0.0756 and 0.0764
E. none of the above
The following is a set of individual measurements: 3 5 4 5 6 3 4 3 2 4 5 6 5 7 6 4 5 5 8 7 6 6 7 7 4
Find the control limits for the range chart.
A. none and 4.2
B. none and 5.1
C. 0.2 and 1.5
D. none of the above
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSBB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.