Exam Details

  • Exam Code
    :C1000-031
  • Exam Name
    :IBM Power Systems Scale-Up Technical Sales
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :101 Q&As
  • Last Updated
    :Apr 12, 2025

IBM IBM Certifications C1000-031 Questions & Answers

  • Question 81:

    A customer has ordered a Power System E980. The system has been built, but cannot be shipped.

    What would prevent the system from being shipped?

    A. The mandatory pre-install TDA has not been completed.

    B. The IBM System Support representative has not completed the pre-install site visit.

    C. The opportunity owner has not released it.

    D. A pre-sale TDA discovered correctable issues that have not been corrected.

  • Question 82:

    A customer would like to add a second HMC to an environment which consists of multiple POWER8 and POWER9 processor-based systems.

    Which of the following is a requirement for both HMCs to be able to manage all the systems?

    A. Both HMCs must be at the same version of HMC Code.

    B. Both HMCs must be on the same HMC VLAN.

    C. All the POWER8 processor-based systems must be at the same firmware level.

    D. Each HMC must be on a dedicated HMC VLAN.

  • Question 83:

    Which of the following statements is true regarding Dynamic Logical Partitioning (DLPAR)?

    A. In a disaster, it will immediately move active LPARs from a local system to a remote system, over the network with only a pause in service.

    B. In a disaster, it will immediately move active LPARs from a local system to another local system, using a common SAN, with only a pause in service.

    C. It enables the relocation of resources such as CPU and memory between LPARs as required, without an interruption in service.

    D. It will automatically allocate an unlicensed processor to an LPAR to replace one that has reached the threshold for errors.

  • Question 84:

    A customer would like to deploy a new application that requires 7 day by 24 hour availability.

    What advantage does the Power System E980 have versus the Power System S924 to satisfy their requirement?

    A. PCIe hot plug adapters

    B. Soft error protection, recovery and self-healing

    C. Active Memory Mirroring

    D. Chipkill memory

  • Question 85:

    A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements.

    How many racks units (EIA) are required?

    A. 8

    B. 9

    C. 6

    D. 10

  • Question 86:

    A customer is comparing a Power Systems solution with an x86 solution for big data analytics.

    Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?

    A. IT Economics Study (Eagle Study)

    B. Performance Navigator

    C. System Planning Tool

    D. Workload Estimator

  • Question 87:

    A customer has several workloads using LPARs. The customer desires that the maximum number of active cores be made available for each workload, a shared SAN connection, and dedicated LAN throughput for each workload.

    Which of the following satisfies the workload requirements?

    A. Dedicated donating cores, NPIV, SR-IOV network

    B. Shared Processor Pool, vSCSI, VIOS SEA

    C. Shared Processor Pool, Dedicated HBAs, dedicated LAN adapters

    D. Shared Processor Pool, NPIV, dedicated LAN adapters

  • Question 88:

    Which IBM Power Systems Software provides network firewall services with the local virtualized server to control network traffic between LPARs?

    A. PowerSC

    B. Trusted AIX

    C. PowerVC

    D. Trusted Surveyor

  • Question 89:

    While migrating from a Power System E880 to a Power System E980, which of the following is automatically provided on both systems?

    A. PowerVM Standard Edition

    B. IBM Cloud PowerVC Manager

    C. PowerVM Enterprise Edition

    D. IBM Cloud Private

  • Question 90:

    Which of the following is an advantage of Power System Servers over Oracle Exadata solutions?

    A. Support for Flash Drives

    B. Ability to add cores and memory

    C. Can run Oracle 12C natively

    D. Offers a greater quantity of cores for enhanced scaling

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.