How can you limit the validity of a bill of material (BOM)? (Choose 2)
A. By plant
B. By material type
C. By industry
D. By period
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
A. Use heuristic.
B. Use a resource group.
C. Use a propagation range.
D. Use a planning group.
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched.
How does the insertion take place?
A. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
B. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
What does the material type influence? (Choose 2)
A. Which plant specific status is allowed
B. Which material master views can be maintained
C. Which document types are allowed
D. Whether the material is produced in-house, procured externally or bouth
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand.
Which planning strategy do you use?
A. Planning with final assembly (40)
B. Make-to-order production (20)
C. Make-to-stock production (10)
D. Planning without final assembly (50)
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do? (Choose 2)
A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
B. Set the creation indicator for purchase requisitions on initial screen of MRP run
C. Add the agreement to the source list and mark it for MRP revalance.
D. Add the agreement to the quota arrangement and mark it for MRP revalance.
Which standard item categories can you select inside a bill of material (BOM)? (Choose 2)
A. Non-stock item
B. Work item
C. Variable-size item
D. WBS item
What happens to this dependent requirement when you convert the planned order into a production order?
A. They are converted into a schedule line.
B. They are converted into a reservation.
C. They are converted into a production order.
D. They are converted into a planned order.
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing. What is the impact of this decision? (Choose 3)
A. Net requirement calcualtion is sales-order specific.
B. A sales-order-specific planning run is required.
C. Storage location MRP areas are required.
D. Production orders specific stock is created
Which of the following elements does MRP take into account during net requirement calculation? (Choose 2)
A. Purchase orders
B. Lot size
C. Maximum stock level
D. Safety stock
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TS422_2021 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.