Exam Details

  • Exam Code
    :C_TSCM42_67
  • Exam Name
    :SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
  • Certification
    :SAP Certifications
  • Vendor
    :SAP
  • Total Questions
    :106 Q&As
  • Last Updated
    :Mar 27, 2025

SAP SAP Certifications C_TSCM42_67 Questions & Answers

  • Question 11:

    Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.

    Which BOM item category must you set to fulfill this requirement?

    A. D (document item)

    B. E (external procurement)

    C. M (phantom material)

    D. N (non-stock item)

  • Question 12:

    What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

    A. Goods receipts

    B. Maintenance notifications

    C. Confirmations

    D. Goods issues

  • Question 13:

    When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)

    A. General values from work scheduling view in the material master

    B. Standard value from operation in task list

    C. User-defined field from operation in task list

    D. General operation values in task list

    E. General item values in bill of materials

  • Question 14:

    With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)

    A. Material identification and reconciliation

    B. Availability check

    C. Batch record

    D. Resource selection

    E. Digital signature

  • Question 15:

    What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

    A. ATP checks can be carried out automatically when releasing a production order.

    B. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.

    C. ATP checks are used to evaluate the free capacity on a certain work center.

    D. ATP checks are mandatory for lead-time scheduling.

    E. ATP checks can be adjusted to also consider future requirements and receipts.

  • Question 16:

    You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly.

    Which standard SAP material type do you use?

    A. NLAG (non-stock material)

    B. FERT (finished product)

    C. ROH (raw material)

    D. HAWA (trading good)

  • Question 17:

    Which of the following statements about the SAP Solution Manager listed is correct?

    A. Solution Manager is part of the SAP ECC System.

    B. Solution Manager is an add-on industry solution.

    C. Solution Manager is a stand-alone system that communicates with other systems in a system landscape.

    D. Solution Manager is a satellite system in a system landscape.

  • Question 18:

    What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

    A. Production supply area

    B. Rate routing

    C. Product cost collector

    D. Control cycle

    E. Production version

  • Question 19:

    Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.

    How is the resulting firming interval specified in this scenario?

    A. By the planning time fence from the material master

    B. By the firming mechanism with the longer firming interval

    C. By the manual firming date

    D. It is predefined in Customizing.

  • Question 20:

    Which of the following are properties of ECC Multi-Site Planning? (Choose two.)

    A. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.

    B. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.

    C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.

    D. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.