Where can you define the default storage location for the material component of a production order? (Choose three)
A. Routing
B. Production supply area of a work center
C. BOM header (product)
D. Production version (product)
E. Material master (component)
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
A. Task list
B. Work center
C. Production version
D. Bill of material
E. Material master
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
A. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
B. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
C. The MRP controller cannot create planned orders within the planning time fence.
D. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
Which functions can be triggered before releasing a production order? (Choose three)
A. Selection of a routing
B. Selection of a BOM
C. Stock determination
D. Confirmation
E. Scheduling
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
A. Substitute sequence
B. Alternative sequence
C. Parallel sequence
D. Standard sequence
You select the master data for production orders via production versions.
Which information is contained in a production version?
A. The explosion dates for the routing and BOM
B. The routing and BOM alternatives to be used
C. The default order type to be used
D. The control parameters for selecting routings and BOM
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.