  • Question 11:

    Which element of the HPE Synergy 12000 Frame protects against loops on the MGMT ports that are connected to the external management network?

    A. Image Streamer

    B. Frame Link Modules

    C. Interconnect Modules

    D. Composer

  • Question 12:

    A customer has moved a USB bootable drive to another compute module but the compute module fails to boot from the USB device.

    What should the Synergy integrator do to resolve this issue?

    A. In the server Profile, make sure OS Deployment is set to Deployment Plan.

    B. Use UEFI System Utilities to disable the B140i RAID controller.

    C. Verify that the USB drive key is enabled in UEFI System Utilities.

    D. Make sure PXE boot is disabled.

  • Question 13:

    A Synergy integrator is modifying the network uplink configuration of a Synergy environment that uses HPE Synergy 40Gb F8 Switch Modules for connectivity.

    What must the Synergy integrator do to make the necessary modifications?

    A. Connect to the switch module CLI and run the necessary configuration commands.

    B. Connect to the end-of-row (EoR) switches and push the configuration to the switch modules.

    C. Connect to HPE OneView running on the Composer module to modify the Logical Interconnect Group (LIG) configuration.

    D. Connect keyboard, monitor, and mouse to the Frame Link module, and run the network configuration wizard.

  • Question 14:

    Where can a Synergy integrator find consolidated information describing environmental requirements, configuration scenarios, and installation preparation needs for the HPE Synergy solution?

    A. HPE QuickSpecs

    B. HPE Synergy Site Planning Guide

    C. HPE SalesBuilder for Windows

    D. HPE Synergy Planning Tool

  • Question 15:

    A customer needs increased available bandwidth and highly available network Virtual Connect interconnects.

    Which two steps must the Synergy integrator perform in the configuration to meet the customer's needs? (Choose two.)

    A. Link Ports L1 and L4 on Master ICMs to ports L1 and L2 on the first Satellite ICM.

    B. Install Redundant Frame Link Modules and a second management ring.

    C. Enable Multimodule Link Aggregation Group (MLAG).

    D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.

    E. Connect Ports Q7 and Q8 on the Master Interconnect Modules (ICM).

  • Question 16:

    When should IP addresses be assigned using an IPv4 address pool in the Composer? (Choose two.)

    A. when configuring management NICs in an operating system

    B. when booting to an iSCSI initiator with Image Streamer

    C. when PXE booting from the deployment server

    D. when configuring Composer appliances

    E. when configuring interconnect modules

  • Question 17:

    A Synergy integrator is configuring an HPE Synergy environment with two HPE Virtual Connect SE 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all compute modules to share the full 160Gb of available bandwidth. The upstream switches are interconnected in a virtual port channel (vPC) pair.

    What should the integrator do to ensure that the switch configuration does not result in a network loop?

    A. Cross connect the Virtual Connect modules to the upstream switches and select all four 40Gb ports for the uplink. Virtual Connect will automatically configure the Multimodule Link Aggregation Group (MLAG).

    B. Create two separate Virtual Connect uplinks. Select two ports from each module for each uplink. Configure spanning tree protocol (STP) on both Virtual Connect uplinks to default to port forward mode.

    C. Cross connect the Virtual Connect modules to the upstream switches and select all four 40Gb ports for the uplink. Configure spanning tree protocol (STP) on the Virtual Connect uplink to default to port forward mode.

    D. Create two separate Virtual Connect uplinks. Select one port from each module for each uplink. Use two separate Logical interconnect Groups (LIGs) to keep the uplinks from looping.

  • Question 18:

    Which component of the HPE Synergy solution provides a customer with the ability to rapidly provision a consistent operating environment?

    A. OpenView

    B. Reference Architecture

    C. Composer

    D. Image Streamer

  • Question 19:

    How should a Synergy integrator configure an HPE Synergy solution to provide shared storage to all compute nodes in a single frame?

    A. Use Composer to configure the P542D smart array controllers to HBA mode and configure the server profiles to include SAN storage.

    B. Import a Linux-based NFS target into Composer and configure the server profiles to include SAN storage.

    C. Use Composer to configure a HPE Synergy D3940 storage module as SAN storage and configure the server profiles to include SAN storage.

    D. Import a StoreServ 3PAR system into Composer and configure the server profiles to include SAN storage.

  • Question 20:

    A Synergy integrator needs a supported approach to update HPE drivers on HPE Synergy Compute Modules that run VMware ESX. Which resource should the Synergy integrator use?

    A. Integrity Support Pack

    B. Intelligent Provisioning

    C. ProLiant Support Pack for VMware

    D. Software Delivery Repository

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-S50 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.