Exam Details

  • Exam Code
    :HPE0-S50
  • Exam Name
    :Integrating HPE Synergy Solutions
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :53 Q&As
  • Last Updated
    :Mar 28, 2025

HP HP Certifications HPE0-S50 Questions & Answers

  • Question 31:

    A customer has a single frame with seven compute modules in bays 1-7. The customer also has an HPE Synergy 12Gb SAS Connection Module in slot 1. The customer recently made a change to require high availability for its storage. What should the Synergy integrator do to meet the customer's requirement for high availability?

    A. Install an additional HPE D3940 storage module to support bays 7-12.

    B. Move the compute module from bay 7 to bay 12.

    C. Add another HPE Synergy 12Gb SAS Connection Module to bay 4.

    D. Move the mezzanine Card to slot 2 on each compute module.

  • Question 32:

    A customer needs a consolidated infrastructure view for HPE Synergy and HPE BladeSystem c7000 enclosures. Which approach should the Synergy integrator take to meet the customer's needs?

    A. Enable federation in the HPE OneView appliance and add remote HPE OneView instances.

    B. Add remote enclosures to monitor the BladeSystem c7000 enclosures.

    C. Deploy HPE OneView Global Dashboard.

    D. Extend the Synergy out-of-band management ring to the c7000 Onboard Administrator ports.

  • Question 33:

    While troubleshooting a hardware issue, a Synergy integrator needs to provide HPE Support with a new support dump. What must the integrator be aware of when generating a support dump?

    A. When creating a new support dump, the previous support dump is deleted.

    B. Only two support dumps can exist on an appliance at any one time.

    C. Root level privileges are required to create a support dump.

    D. Management tasks are suspended during support dump creation.

  • Question 34:

    Refer to the exhibit.

    How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?

    A. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.

    B. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.

    C. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.

    D. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.

  • Question 35:

    Refer to the exhibit.

    A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules. What is the maximum number of compute nodes that the customer's fabric could support?

    A. 24

    B. 36

    C. 48

    D. 60

  • Question 36:

    Refer to the exhibit.

    Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?

    A. Smartlink will be triggered

    B. There will be no NIC failover.

    C. Uplink bandwidth will decrease.

    D. Server and downlinks will fail.

  • Question 37:

    Refer to the exhibits.

    A customer has a Synergy 2-frame design, as shown above.

    Due to expanding business needs, the customer has ordered a third frame to expand the environment to a 3-frame fabric design, as shown below.

    While attempting to extend the Logical Interconnect Group (LIG) for the enclosure group, the Synergy integrator is unable to add the third frame. What is preventing the integrator from adding the third frame?

    A. The Virtual Connect SE 40Gb F8 modules are installed in the incorrect location.

    B. The incorrect interconnect Link modules have been installed.

    C. The Frame Link Module firmware has not been updated in the new frame.

    D. The HPE OneView software on the Composer has not been updates to the latest version.

  • Question 38:

    A Synergy integrator has planned a highly available Synergy composable fabric with 20Gb Interconnect Link Modules. What is the maximum number of SY 480 Gen9 compute modules the integrator can install into this configuration?

    A. 12

    B. 24

    C. 36

    D. 48

  • Question 39:

    A customer needs to collect a support dump from its appliance, but when the customer attempts to save the support dump to a USB drive, no valid USB drive displays as available in the HPE Synergy Management Console.

    Which action should the Synergy integrator propose to the customer?

    A. Verify that the USB being used in no larger than 4GB.

    B. Format the USB drive on a computer prior to collecting the support dump.

    C. Insert the USB drive in any of the compute nodes.

    D. Enable the compute module to format the USB drive prior to collecting the support dump.

  • Question 40:

    A customer needs to attach 20 HPE 1TB 6G SAS SFF hard drives to an HPE Synergy 480 Gen9 compute module. The customer needs a fully redundant storage solution.

    Which HPE products meet the customer's needs? (Choose three.)

    A. HPE D3940 storage module with HPE Synergy D3940 Redundant I/O Adapter.

    B. HPE D3940 storage module with Single I/O Adapter.

    C. two HPE Synergy 12Gb SAS Connection Modules

    D. two HPE Smart Array P542D Controllers

    E. one HPE Smart Array P542D Controller

    F. one HPE Synergy 12Gb SAS Connection Module

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-S50 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.