  • Question 51:

    Which of the following master data is necessary for the creation of material reservations for production orders?

    A. Material master records

    B. Production/resource tools

    C. Routings

    D. Production versions

  • Question 52:

    What functions can you use for sub operations? (Choose two)

    A. Costing

    B. Material component allocation

    C. Production/Resource tools allocation

    D. Capacity planning

  • Question 53:

    When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)

    A. At the company code level

    B. At the plant level

    C. At the business area level

    D. At the client level

  • Question 54:

    You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.

    Which sequence category do you use to create the second sequence in the system?

    A. Finish-start relationship

    B. Standard sequence

    C. Parallel sequence

    D. Alternative sequence

  • Question 55:

    What could be a consequence of the confirmation of an operation?

    A. Settlement of the actual costs

    B. Reduction of capacity requirements

    C. Rescheduling of the production order

    D. Update of the planned costs

  • Question 56:

    Which Customizing element controls the determination of planned costs in production orders?

    A. Accounting type

    B. Costing variant

    C. Calculation procedure

    D. Settlement profile

  • Question 57:

    The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.

    However, a corresponding rescheduling exception message does not appear.

    What could be the reasons? (Choose two)

    A. The delta between the availability dates falls within the tolerance window defined in Customizing.

    B. The fixed planned order is outside the rescheduling horizon.

    C. Requirements planning has not been carried out.

    D. The MRP elements are linked via fixed pegging.

  • Question 58:

    From what point can you no longer use the Read PP master data in the production order?

    A. After printing the order papers.

    B. After the first posting of goods movements or confirmation.

    C. From the release of the production order.

    D. After assigning the confirmed quantity of a material component due to carrying out a material availability check.

  • Question 59:

    Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?

    A. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.

    B. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.

    C. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.

    D. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.

  • Question 60:

    After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).

    Which of the following planning file entries for this material are set by the system?

    A. The BOM explosion and the NETPL planning indicator

    B. The BOM explosion indicator

    C. The BOM explosion, the NETCH, and the NETPL planning indicators

    D. The NETCH and NETPL planning indicators

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.