An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
A. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
B. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
C. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
D. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
Which of the following elements can be used in a process order? (Choose three)
A. Process instructions
B. Parallel sequences
C. Relationships
D. Suboperations
E. Phases
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
A. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
B. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
C. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
D. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
A. The static safety stock and the material forecast
B. The average daily demand and the safety time
C. The average daily demand and the desired range of coverage
D. The static safety stock per day and the safety time
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
A. Set "Container in process"
B. Set "Container empty"
C. Set "Container in transport"
D. Set "Container full"
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).
What could be the reason?
A. There are no planned orders or production orders present.
B. The repetitive manufacturing indicator has been set.
C. There is no valid production version for this material.
D. There are no requirements present.
Where in the SAP ECC system can you define production versions?
A. In the material master
B. In the routing
C. In the bill of material
D. In the work center
You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?
A. The material availability check has been performed.
B. Goods movements have been posted.
C. The production order has been released.
D. Order papers have been printed.
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two)
A. Production order
B. Product cost collector
C. Work center
D. Planned order
Which of the following properties about the planning functions available in SAP ECC applies?
A. Long-term planning (LTP) is a long-term form of forecasting.
B. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
C. Material requirements planning (MRP) includes automatic capacity leveling.
D. Master production scheduling (MPS) refers to preferred planning of important materials.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.